logo
TenderContract Notice

New CT and ICU Extension - Connolly Hospital Blanchardstown

The scope, dates and status of this tender. A free account opens every field.

Source: TED Europa

The new CT and ICU development at Connolly Hospital Blanchardstown forms an extension to the existing hospital and includes local renovations of the main hospital buildings where the new building connects to existing accommodation at ground and first floor level. The development is located on a constrained site which is enclosed on 3 sides by sensitive clinical accommodation including theatres, HD

Status
Closed
Sector
Road, Hospital, Commercial
Location
Ireland
Updated
3 Nov 2026
Source
TED Europa

ConstructChat

Ask ConstructChat about New CT and ICU Extension - Connolly Hospital Blanchardstown

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “New CT and ICU Extension - Connolly Hospital Blanchardstown” is a tender record in Taiyo, linked to the Road sector. It is issued for works, goods, or services related to Ireland.

Participants

Not available for this record.

Status

Original status

contract notice

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

The new CT and ICU development at Connolly Hospital Blanchardstown forms an extension to the existing hospital and includes local renovations of the main hospital buildings where the new building connects to existing accommodation at ground and first floor level. The development is located on a constrained site which is enclosed on 3 sides by sensitive clinical accommodation including theatres, HDU, and Radiology. The hospital’s emergency department and blue light access route is located directly to the north of the site. Live hospital services must be maintained for the duration of construction. The development is comprised of 3 storeys as set out below: Ground Floor Level: The ground floor includes a new reception and waiting area for the hospital’s radiology department as well as administrative and support areas including offices, WCs and changing areas. The ground floor also includes a new CT scanner suite and associated control room and local plant space. The ground floor has a number of critical interfaces and tie-ins with existing buildings including the emergency department and existing radiology department. First Floor Level: The first floor of the proposed development provides a new ICU facility for the hospital which includes 4 no. segregated ICU patient rooms and 1 no. isolation suite as well as ancillary spaces and general support accommodation for staff and equipment. This floor will directly connect with the existing theatres and HDU by way of a high-level link which will require local reconfiguration of the Theatre and HDU departments and modification of existing building fabric similar to at ground floor level. Second Floor Level: The second floor contains an enclosed, dedicated plant room to serve the CT and ICU levels below. A new stair core and evacuation lift is proposed to serve all levels of the extension.

Original sector

Construction work, Construction work, Construction work

Location

Country

Ireland

Source

Source

TED Europa

URL

More Details

Record type

Tender

Sector

Road, Hospital, Commercial

Article published date

2026-04-16

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender