New Drinking Water Well and Raw Waterline Extension
Closed · Missouri · Last reported Mar 2026
Source: Missouri Purchasing Group
1 . Project Coordination & Preliminary Evaluation o Conduct site evaluations , hydrogeologic assessments , and preliminary design reviews . o Coordinate with City staff , regulatory agencies , and utility stakeholders . o Develop a detailed project schedule and communication plan . 2 . Surveying & Investigation o Perform all ne
- Status
- Closed
- Sector
- Road, Water Supply and Storage, Power Transmission, Power Generation (CCGT)
- Location
- Missouri, United States of America
- Updated
- 3 Nov 2026
- Source
- Missouri Purchasing Group
ConstructChat
Ask ConstructChat about New Drinking Water Well and Raw Waterline Extension
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | 1 . Project Coordination & Preliminary Evaluation o Conduct site evaluations , hydrogeologic assessments , and preliminary design reviews . o Coordinate with City staff , regulatory agencies , and utility stakeholders . o Develop a detailed project schedule and communication plan . 2 . Surveying & Investigation o Perform all necessary field surveys , mapping , and property boundary verification . o Identify environmental , geotechnical , and utility conflicts affecting design and construction . 3 . Well Design & Development o Prepare design documents for drilling , construction , and development of the new public water supply well . o Specify casing , screen materials , pumping equipment , controls , and testing requirements . o Well Design Should meet these criteria : 1 . Well diameter : 12 ” Hole with a 5 - inch column of water 2 . Pump : Three - phase , 100 HP 3 . Installation must comply with all DNR regulations and local permitting requirements . 4 . Provide all necessary controls , valves , and monitoring equipment . 4 . Raw Waterline Design o Design the 12 ” raw water transmission line , route alignment , materials , appurtenances , and connections to existing infrastructure . o Pressure testing , disinfection , and compliance with state / local standards are required . o Include plans for easements , rights - of - way , and property access as required . |
Location
Country | United States of America (USA) |
State | Missouri |
Source
Source | Missouri Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Road, Water Supply and Storage, Power Transmission, Power Generation (CCGT) |
Article published date | 2026-04-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Road tenders in United States of America
- RFP - Pro-Tem Hearing Examiner
- NEW TIRES RETREADS AND TIRE SERVICES
- Professional Construction Engineering and Inspection CEI Services for the Williamson Boulevard Widening
- Lincoln Avenue Wascher to Killarney Preliminary Engineering Section 220065800PV
- KilleenFort Hood Regional Airport KFHRA Terminal Apron Rehabilitation Phase II
- IFB 947902022JM Screening 10 Asphalt Filter Stone 8 Granite Double Washed
- IFB 914202022AM Street Sweeper Parts and Brooms
- IFB 843402021AB Hay Alfalfa and Wheat Straw for Norfolk Zoo
