logo

New Eaton Ups Battery & Rental

The scope, dates and status of this tender. A free account opens every field.

Source: SAM.gov

Tender
Sources Sought

Please see attached Sources Sought Notice and Statement of Work. Questions w Answers Could the Government please provide the required electrical characteristics for the permanent UPS system, including input/output voltage, phase, and frequency? Input/Output Voltage: 208V or 220V, 3-phase power supply. Could the Government please specify the required battery backup runtime for the permanent UPS sys

Status
Prospective
Sector
Aerospace & Defense, Energy Storage, Government, Commercial, Residential, Manufacturing (Industrial), Power Generation (CCGT)
Location
California, United States of America
Updated
3 Nov 2026
Source
SAM.gov

ConstructChat

Ask ConstructChat about New Eaton Ups Battery & Rental

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “New Eaton Ups Battery & Rental” is a tender record in Taiyo, linked to the Aerospace & Defense sector. It is issued for works, goods, or services related to California, United States of America.

Participants

Not available for this record.

Status

Original status

sources sought

Taiyo status

Prospective

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

Please see attached Sources Sought Notice and Statement of Work. Questions w Answers Could the Government please provide the required electrical characteristics for the permanent UPS system, including input/output voltage, phase, and frequency? Input/Output Voltage: 208V or 220V, 3-phase power supply. Could the Government please specify the required battery backup runtime for the permanent UPS system? The system needs to provide 480 minutes of runtime. Are existing electrical one-line diagrams, as-built drawings, or other relevant electrical drawings for Building 1524 available to support development of the ROM estimate? No. Could the Government please clarify the required maintenance bypass configuration for the new UPS installation? To prevent any disruption to critical operations, the Government requires the installation of a temporary UPS system to support the active load prior to decommissioning the legacy unit and installing the new permanent Eaton 93PM system.

Original sector

Not Identified

Location

Country

United States of America (USA)

State

California

Source

Source

SAM.gov

URL

More Details

Record type

Tender

Sector

Aerospace & Defense, Energy Storage, Government, Commercial, Residential, Manufacturing (Industrial), Power Generation (CCGT)

Article published date

2026-07-02

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender