New Jersey Intra Coastal Waterway Bank/Shoreline Stabilization Cape May Canal/Point Pleasant Canal
Solicitation · United States of America
Source: SAM.gov
THE PURPOSE OF AMENDMENT 0001 TO SOLICITATION W912BU26BA010 IS TO INCORPORATE THE FOLLOWING CHANGES:A.) PROVIDE ANSWERS TO THE RFIS SUBMITTED AND TO PROVIDE THE SIGN-IN SHEET FROM THE PRE-BID SITE VISIT.B.) UPDATE FAR PROVISION 52.252-3, ALTERATIONS IN SOLICITATION.C.) ADD FAR 52.249-2 ALT 1 TERMINATION FOR CONVENIENCE OF THE GOVERNMENT (FIXED-PRICE)The U.S. Army Corps of Engineers, Philadelphia D
- Status
- Closed
- Sector
- Water Supply and Storage, Aerospace & Defense, Manufacturing (Industrial), Government, Commercial, Residential
- Location
- United States of America
- Updated
- 3 Nov 2026
- Source
- SAM.gov
ConstructChat
Ask ConstructChat about New Jersey Intra Coastal Waterway Bank/Shoreline Stabilization Cape May Canal/Point Pleasant Canal
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | solicitation |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | THE PURPOSE OF AMENDMENT 0001 TO SOLICITATION W912BU26BA010 IS TO INCORPORATE THE FOLLOWING CHANGES:A.) PROVIDE ANSWERS TO THE RFIS SUBMITTED AND TO PROVIDE THE SIGN-IN SHEET FROM THE PRE-BID SITE VISIT.B.) UPDATE FAR PROVISION 52.252-3, ALTERATIONS IN SOLICITATION.C.) ADD FAR 52.249-2 ALT 1 TERMINATION FOR CONVENIENCE OF THE GOVERNMENT (FIXED-PRICE)The U.S. Army Corps of Engineers, Philadelphia District, intends to award a firm fixed contract for New Jersey Intra Coastal Waterway Bank/Shoreline Stabilization Cape May Canal/Point Pleasant Canal in Cape May, New Jersey. DESCRIPTION: The contract work consists of construction of a revetment of approximately 220 linear feet on the north bank of the Cape May Canal, in Lower Township, New Jersey and placement of riprap toe protection at the Point Pleasant Canal bulkhead in Point Pleasant, NJ. Work at the Cape May Canal site includes clearing and grubbing, removal and disposal of gabion basket wire, excavation, placement of geotextile, installation of marine mattress, placement of riprap and imported sand fill, restoration of the area including topsoil, seeding and mulching, and fabrication and installation of signage. Work at the Point Pleasant site consists of the placement of riprap in the water at the toe of the existing bulkhead at the canal entrance to the Manasquan River. DISCLOSURE OF MAGNITUDE OF THE PROPOSED CONSTRUCTION PROJECT: $1,000,000 and $5,000,000. NAICS CODE AND SBA SIZE STANDARD: 237990, Other Heavy and Civil Engineering Construction, Size Standard $45.0M. PERIOD OF PERFORMANCE: 365 Calendar Days from the Notice to Proceed (NTP). Pre-Bid Site Visit: The pre-bid site visit has been scheduled for Wednesday, 17 March 2026 at 12:00 PM Eastern Daylight Time (EDT), at the Cul-de-sac at the end of New Port Drive and the Cape May Canal, Lower Township, NJ Recommend using GPS coordinates, 3857 24.7 N 7454 30.9 W. There will only be one site visit. Bidders should inspect the job site prior to submitting an offer. Bidders should take such other steps as may be reasonably necessary to ascertain the nature and location of the work and the general and local conditions that can affect the work or the cost thereof. Failure to do so will not relieve offerors from the responsibility for properly estimating the difficulty or cost of successfully performing the work. The Government assumes no responsibility for any understanding or representations concerning conditions made by any of its officers, agents or employees, unless included in the solicitation, the specifications or related documents. REGISTRATION: Only registered persons will be permitted to attend the site visit. In addition to the information below, please also provide your firms name, firms CAGE and/or Unique Entity Identifier (a 12-character alphanumeric ID assigned to an entity by SAM.gov and formerly known as DUNS) number, and name and position title of primary point-of-contact and their telephone number and email address. NAP POCs for Registration: For questions and/or concerns regarding the Site Visit, please contact Molly Gallagher at Molly.Gallagher@usace.army.mil. Please submit all site visit request forms to Molly Gallagher at Molly.Gallagher@usace.army.mil and Connor Struckmeyer at Connor.A.Struckmeyer@usace.army.mil. SYSTEM FOR AWARD MANAGEMENT (SAM): Bidders are required to be registered in the System for Award Management (SAM) database (https://sam.gov) and PIEE at the time a bid is submitted in order to comply with the annual representations and certifications requirements. Registration for PIEE is required as this is the only place bids shall be submitted. Bids must be submitted in PIEE Solicitation Module. ADDITIONAL INFOMRATION: Specific information pertaining to this procurement will be available in the solicitation. The solicitation documents will be posted on the SAM.gov website, https://sam.gov and PIEE Solicitation Module. It is and will continue to be the responsibility of all potential Bidders to monitor the SAM.gov website for any amendments, updates, responses to questions and answers, etc. as the Government will not be maintaining a mailing list. |
Original sector | Construction |
Location
Country | United States of America (USA) |
Source
Source | SAM.gov |
URL |
More Details
Record type | Tender |
Sector | Water Supply and Storage, Aerospace & Defense, Manufacturing (Industrial), Government, Commercial, Residential |
Article published date | 2026-03-26 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Water Supply and Storage tenders in United States of America
- RFP - Thurston County Lake Management Districts Submerged Aquatic Vegetation Control
- Coatings for Wet Well and Manholes
- Sole Source for Wedeco UV BulbsBallets
- Security Hardware Services
- Chambers Creek Regional Wastewater Treatment Plant BNR Aeration Basin Airflow Meters
- Se Dixie Highway County Road A1A Utility Relocation Project
- UNPAINTED SNOW FENCE AND DUNE GRASS NO II
- PreQualification of Bidders for Chaboya Improvements
