New Learner Pool at Didcot Wave Leisure Centre
Sector: Architectural • Location: United Kingdom
Source: Find a Tender Service (UK)
To refine the design of the new learner pool. Achieving greater cost certainty for the project. Maintaining momentum on the project to ensure that should the next stages be approved, the project has the best chance of being delivered in time to avoid loss of Section 106 funding allocated to the project (expires in October 2027).
- Status
- Closed
- Sector
- Architectural, construction, engineering and inspection services
- Location
- United Kingdom
- Updated
- 3 Nov 2026
- Source
- Find a Tender Service (UK)
ConstructChat
Ask ConstructChat about New Learner Pool at Didcot Wave Leisure Centre
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | complete |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | To refine the design of the new learner pool. Achieving greater cost certainty for the project. Maintaining momentum on the project to ensure that should the next stages be approved, the project has the best chance of being delivered in time to avoid loss of Section 106 funding allocated to the project (expires in October 2027). |
Original sector | Architectural, construction, engineering and inspection services |
Location
Country | United Kingdom (UK) |
Source
Source | Find a Tender Service (UK) |
URL |
More Details
Record type | Tender |
Article published date | 2026-09-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
