logo

Nez Perce-Clearwater Nf Salmon River Seed Orchard Well Drilling (2026)

One of 9,550 tenders Taiyo tracks in Idaho.

Source: SAM.gov

Tender
Combined Synopsis/Solicitation

This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Part 12. This announcement constitutes the only solicitation. Quotations are being requested and separate written solicitation will not be issued. Solicitation number 1240LU26Q0065 is issued as a Request for Quotation (RFQ) for Salmon River Seed Orchard Well Drilling. This project aims to pr

Status
Prospective
Sector
Water Supply and Storage, Raw Materials, Waste Processing and Treatment, Commercial, Residential
Location
Nezperce, Idaho, United States of America
Updated
3 Nov 2026
Source
SAM.gov

ConstructChat

Ask ConstructChat about Nez Perce-Clearwater Nf Salmon River Seed Orchard Well Drilling (2026)

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Nez Perce-Clearwater Nf Salmon River Seed Orchard Well Drilling (2026)” is a tender record in Taiyo, linked to the Water Supply and Storage sector. It is issued for works, goods, or services related to Nezperce, Idaho, United States of America.

Participants

Not available for this record.

Status

Original status

combined synopsis/solicitation

Taiyo status

Prospective

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Part 12. This announcement constitutes the only solicitation. Quotations are being requested and separate written solicitation will not be issued. Solicitation number 1240LU26Q0065 is issued as a Request for Quotation (RFQ) for Salmon River Seed Orchard Well Drilling. This project aims to provide potable water to the nursery located at the Salmon River Seed Orchard. The Forest Service plans to drill a well to provide potable water to the nursery. The well will be completed in accordance with the plans and specifications provided by the Forest. If the first well drilled does not meet specifications, then, additional alternative 1 (Option 1) will be utilized to decommission the first well drilled and then drill a second well. If well 2 does not meet specifications, then additional alternative 2 (Option 2) will be utilized to decommission the second well. This acquisition is set-aside for small business concerns. The applicable North American Industry Classification Standard Code is 237110 Water and Sewer Line and Related Structures Construction. The small business size standard is $45M. This acquisition is a Total Small Business Set-Aside. All responsible sources may submit a quotation which will be considered by the agency. SCOPE OF CONTRACT This project aims to provide potable water to the nursery located at the Salmon River Seed Orchard. The Forest Service plans to drill a well to provide potable water to the nursery. The well will be completed in accordance with the plans and specifications provided by the Forest. If the first well drilled does not meet specifications, then, additional alternative 1 (Option 1) will be utilized to decommission the first well drilled and then drill a second well. If well 2 does not meet specifications, then additional alternative 2 (Option 2) will be utilized to decommission the second well. PROJECT LOCATION This project is in the Salmon River Seed Orchard contained within the Nez Perce-Clearwater National Forests. The project is located in Section 23, Township 26N, Range 1E. MAGNITUDE OF CONSTRUCTION PROJECT Between $100,000 and $250,000. SITE VISIT No official Site Visit shall be performed. Contractors are highly encouraged to visit the Salmon River Seed Orchard to familiarize themselves with the layout of the site. Contractor is encouraged and expected to visit the site. PERIOD OF PERFORMANCE Work on the site shall commence no earlier than June 01, 2026, and proceed in accordance with the contractor’s approved work schedule and run continuously till the end of the project no later than May 31, 2027. Bid Bond/Offer Guarantee (FAR 52.228-1) 20% required if quote/offer in excess of $150,000. Performance & Payment Bonds (FAR 52.228-15) Both required at 100% of original contract price if value in excess of $150,000, due 10 days after award. Only payment protections are required for contracts exceeding $35,000 but not exceeding $150,000, irrevocable letter of credit or payment bond allowed per FAR 52.228-13, due within 10 days of contract award. DOCUMENTS TO RETURN The following documents shall be submitted by the quoter for evaluation to be considered responsive: ? Schedule of Items ? Experience Questionnaire ? Bid guarantee per information above. ? Acknowledge Amendments (per the instructions in Block 11 on the SF-30) if applicable. Send quote to: Forest Service, Property and Procurement Services, Intermountain Zone, CSA #9 Attn: Daniel Franco at E-mail: Daniel.franco@usda.gov

Original sector

Construction

Location

Country

United States of America (USA)

State

Idaho

City

Nezperce

Source

Source

SAM.gov

URL

More Details

Record type

Tender

Sector

Water Supply and Storage, Raw Materials, Waste Processing and Treatment, Commercial, Residential

Article published date

2026-04-28

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender