logo

NHM150 Western Galleries - Base Build Lead Architect

Sector: Education • Location: United Kingdom

Source: Open Contracting Data Standard (OCDS)

Tender
Active

The Natural History Museum has announced important transformations of its internal spaces ahead of the 150th anniversary of the opening of the South Kensington site, occurring in 2031. As part of these transformations, the popular Dinosaur Gallery will be restored, and the Origins Gallery, the Old General Herbarium and the Swing Space, currently closed to the public, will be reopened and returned

Status
Bidding
Sector
Education, Commercial
Location
United Kingdom
Updated
3 Nov 2026
Source
Open Contracting Data Standard (OCDS)

ConstructChat

Ask ConstructChat about NHM150 Western Galleries - Base Build Lead Architect

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “NHM150 Western Galleries - Base Build Lead Architect” is a tender record in Taiyo, linked to the Education sector. It is issued for works, goods, or services related to United Kingdom.

Participants

Not available for this record.

Status

Original status

active

Taiyo status

Bidding

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

The Natural History Museum has announced important transformations of its internal spaces ahead of the 150th anniversary of the opening of the South Kensington site, occurring in 2031. As part of these transformations, the popular Dinosaur Gallery will be restored, and the Origins Gallery, the Old General Herbarium and the Swing Space, currently closed to the public, will be reopened and returned to public use. These galleries are identified collectively as the' Western Galleries'. The works in each gallery will be articulated in two phases: base build, which is the object of this tender, and fit out, which will be tendered separately. The first works to commence will be the Swing Space in Autumn 2027 (base build) for an opening in 2028, followed shortly after by the Botany Library and the Old General Herbarium, due in 2029, Dinosaur Gallery, opening in 2030, and Origins Gallery that will be completed in 2031. A Feasibility Study has just been completed both for base build and fit-out leading to the identification of a set of recommended options for the base build and a set of design principles for the fit-out. The base build works for all the galleries in scope will encompass design and works for (high-level scope, including but not limited to): - Conservation of the gallery spaces - Making good of the fabric of the building - New ventilation and heating / cooling system and associated Building Works in Connection (BWIC) - Mechanical, electrical and public health systems - Creation of new plant rooms to support the increased needs of the spaces - Required structural works Additional works (including but not limited to): - clearance of existing spaces - Dismantling and removal of Dinosaur Gallery walkway - Decant and recant of Botany Library contents - Temporary relocation of Dino Shop - Decant and relocation of offices to make room for the new circulation core - Relocation and enlargement of ground floor café - Conservation of existing fixtures and finishes (e.g. cabinets and bookcases) in Old General Herbarium and Botany Library - Removal of existing Dino shop and dog leg corridor in the Swing Space - Creation of 2 new vertical circulation cores (lifts and staircase) - Decant and relocation of offices to make room for the new circulation core - Creation of new toilets and ancillary spaces - Relocation and enlargement of ground floor café - Creation of new café on the first floor - Fit out of new Dino Shop and the two cafes. The appointed consultants will be asked to act as Lead Architect, developing the base build design for the galleries and ancillary spaces across RIBA stages 2-7, supervising and coordinating the works of the other base build consultants, such as, but not limited to, MEP consultants, circulation consultants, accessibility consultant and fire consultant and coordinating the fit-out consultants to ensure continuity between the projects. They will also be asked to provide Heritage consultancy, structural engineer, sustainability and BSA Principal Design services for the base build and fit out projects. In order to access the documents for the tender exercise, all tenderers must complete the NDA available in the SQ stage document library. The NDA must be signed by an appropriate representative of the tendering company and returned to the Museum for countersignature. Once the NDA has been completed by both parties, it will be sent to tenderers for record keeping. The tenderer will then be added to the Tenderbox stage. Bidders who signed an NDA as part of the Pre-Market Engagement stage do NOT need to sign the NDA again, and will be added to the Tenderbox automatically. Once bidders have been added to the Tenderbox they will receive an automated e-mail from Delta. For more information about this opportunity, please visit the eSourcing portal at: https://www.delta-esourcing.com/tenders/UK-UK-London:-Construction-work-for-art-and-cultural-buildings./Q9A7G84683 To respond to this opportunity, please click here: https://www.delta-esourcing.com/respond/Q9A7G84683

Location

Country

United Kingdom (UK)

Source

Source

Open Contracting Data Standard (OCDS)

URL

More Details

Record type

Tender

Sector

Education, Commercial

Article published date

2026-06-02

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender