Nist Boulder Building 2 1330 Fume Hood Replacement
One of 10,000+ tenders Taiyo tracks in Colorado.
Source: SAM.gov
The National Institute of Standards and Technology (NIST), Boulder, Colorado, is seeking information from qualified contractors capable of performing construction services for the replacement of an existing laboratory fume hood and associated rooftop exhaust system in Building 2, Room 1330 at the NIST Boulder Campus (325 Broadway, Boulder, CO). The project includes demolition and replacement of an
- Status
- Closed
- Sector
- Commercial, Residential
- Location
- Boulder, Colorado, United States of America
- Updated
- 3 Nov 2026
- Source
- SAM.gov
ConstructChat
Ask ConstructChat about Nist Boulder Building 2 1330 Fume Hood Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | sources sought |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | The National Institute of Standards and Technology (NIST), Boulder, Colorado, is seeking information from qualified contractors capable of performing construction services for the replacement of an existing laboratory fume hood and associated rooftop exhaust system in Building 2, Room 1330 at the NIST Boulder Campus (325 Broadway, Boulder, CO). The project includes demolition and replacement of an existing tabletop fume hood installed in 1992 with a new walk-in fume hood and hazardous exhaust fan to support new research involving larger equipment and toxic gases. Work will include architectural, mechanical, plumbing, electrical, and fire alarm modifications, including removal and replacement of countertops, sink, plumbing connections, ductwork, rooftop exhaust fan, electrical circuits, cable tray, lightning protection connections, and installation of a panic alarm system integrated with the building fire alarm system. The contractor will also provide structural design and installation of exhaust stack supports, perform ASHRAE 110 performance testing of the hood and exhaust system, and coordinate construction activities with NIST personnel. The anticipated period of performance is approximately six months from the date of award. |
Original sector | Construction |
Location
Country | United States of America (USA) |
State | Colorado |
City | Boulder |
Source
Source | SAM.gov |
URL |
More Details
Record type | Tender |
Sector | Commercial, Residential |
Article published date | 2026-03-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Commercial tenders in United States of America
- Sanitary Sewer Lateral Lining Pilot Program Section 230067500SA
- Trophies Plaques Awards ETC
- Painting Services for Building Exteriors Infrastructure Systems and Pressure Washing
- OAM Learning Management System
- CYBER SECURITY PENETRATION TESTING
- PROMOTIONAL ITEMS SOUVENIRS
- Proposed Services at Former Ingleside Recreation Center
- Towing Services CityOwned Vehicles Light and Heavy Duty
