NLV Pharos Harbour Generator Overhaul
One of 10,000+ tenders Taiyo tracks in United Kingdom.
Source: Open Contracting Data Standard (OCDS)
The Pharos Harbour Generator is used when the vessel is harbour when no crane operations are ongoing, this is predominately during the evenings and sometimes during day operations. There has been significant periods where the generator has not been available due to breakdown, or other technical issues. A full overhaul should avoid these periods.
- Status
- Closed
- Sector
- Seaport
- Location
- United Kingdom
- Updated
- 3 Nov 2026
- Source
- Open Contracting Data Standard (OCDS)
ConstructChat
Ask ConstructChat about NLV Pharos Harbour Generator Overhaul
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | complete |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | The Pharos Harbour Generator is used when the vessel is harbour when no crane operations are ongoing, this is predominately during the evenings and sometimes during day operations. There has been significant periods where the generator has not been available due to breakdown, or other technical issues. A full overhaul should avoid these periods. |
Location
Country | United Kingdom (UK) |
Source
Source | Open Contracting Data Standard (OCDS) |
URL |
More Details
Record type | Tender |
Sector | Seaport |
Article published date | 2026-11-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
