logo

Nolin River Lake Tailwater Restroom Construction

Combined synopsis/solicitation · Kentucky

Source: SAM.gov

Tender
Combined Synopsis/Solicitation

PROJECT TITLE: NOLIN RIVER LAKE TAILWATER RESTROOM CONSTRUCTION PROJECT LOCATION: NOLIN RIVER LAKE, KENTUCKY THE CONTRACTOR WILL FURNISH ALL LABOR, MATERIALS, TOOLS AND EQUIPMENT NECESSARY TO CONSTRUCT A FLUSH RESTROOM FACILITY AT THE TAILWATER RECREATION AREA OF NOLIN RIVER LAKE, KENTUCKY IN ACCORDANCE WITH THESE SPECIFICATIONS AND REQUIREMENTS. THE CONTRACTORS WORK AND RESPONSIBILITY WILL INCLUD

Status
Prospective
Sector
Commercial, Hydro, Aerospace & Defense, Residential
Location
Mammoth Cave, Kentucky, United States of America
Updated
3 Nov 2026
Source
SAM.gov

ConstructChat

Ask ConstructChat about Nolin River Lake Tailwater Restroom Construction

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Nolin River Lake Tailwater Restroom Construction” is a tender record in Taiyo, linked to the Commercial sector. It is issued for works, goods, or services related to Mammoth Cave, Kentucky, United States of America.

Participants

Not available for this record.

Status

Original status

combined synopsis/solicitation

Taiyo status

Prospective

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

PROJECT TITLE: NOLIN RIVER LAKE TAILWATER RESTROOM CONSTRUCTION PROJECT LOCATION: NOLIN RIVER LAKE, KENTUCKY THE CONTRACTOR WILL FURNISH ALL LABOR, MATERIALS, TOOLS AND EQUIPMENT NECESSARY TO CONSTRUCT A FLUSH RESTROOM FACILITY AT THE TAILWATER RECREATION AREA OF NOLIN RIVER LAKE, KENTUCKY IN ACCORDANCE WITH THESE SPECIFICATIONS AND REQUIREMENTS. THE CONTRACTORS WORK AND RESPONSIBILITY WILL INCLUDE ALL PLANNING, PROGRAMMING, MEASUREMENTS AND ESTIMATES OF QUANTITIES, ADMINISTRATION, SUPERVISION, COMMUNICATIONS, AND INSPECTION NECESSARY TO ENSURE THAT ALL WORK IS CONDUCTED IN ACCORDANCE WITH THE CONTRACT REQUIREMENTS AND ALL APPLICABLE FEDERAL, STATE, AND LOCAL LAWS AND REGULATIONS. THE PRIME CONTRACTOR SHALL BE RESPONSIBLE FOR ENSURING ALL SUBCONTRACTORS COMPLY WITH THE PROVISIONS OF THIS CONTRACT. PREVAILING CONSTRUCTION WAGE RATES WILL BE REQUIRED AND SHOULD BE CONSIDERED WITH YOUR QUOTE. 36.204 DISCLOSURE OF THE MAGNITUDE OF CONSTRUCTION PROJECT: BETWEEN $100,000.00 AND $250,000.00. THIS PROCUREMENT IS 100% SET-ASIDE FOR SMALL BUSINESS UNDER NAICS 236220, SIZE STANDARD $45,000,000.00. IN LIEU OF BOTH PERFORMANCE AND PAYMENT BONDS, PER RFO 52.228-13 ALTERNATE PAYMENT PROTECTIONS (2000) AND RFO 28.102-1(B), ONLY A PAYMENT BOND OR IRREVOCABLE LETTER OF CREDIT IS REQUIRED. INFORMATION REGARDING THE U.S. ARMY CORPS OF ENGINEERS PROCESS FOR SETTLING REQUESTS FOR EQUITABLE ADJUSTMENTS AND DURATION GOALS TO ACHIEVE DEFINITIZATION OF EQUITABLE ADJUSTMENTS FOR CHANGE ORDERS UNDER CONSTRUCTION CONTRACTS CAN BE FOUND BY GOING TO HTTPS: //WWW.USACE.ARMY.MIL/STRATEGIC-PARTNERSHIPS/PARTNERING/MOD/129895/DETAILS/443/ THEN SCROLLING DOWN ON RIGHT HAND SIDE OF PAGE BY CLICKING ON VIEW FFP CONTRACT CHANGES PLAYBOOK HERE.

Original sector

Construction

Location

Country

United States of America (USA)

State

Kentucky

City

Mammoth Cave

Source

Source

SAM.gov

URL

More Details

Record type

Tender

Sector

Commercial, Hydro, Aerospace & Defense, Residential

Article published date

2026-09-05

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender