Nome Creek Stream Reclamation 2026
Sector: Road • Location: Alaska, United States of America
Source: Alaska Purchasing Group
1 . The intent of this RFQ is to provide the following equipment and operators . a . 30 , 000 lb . excavator for the duration . b . 30 - ton rock truck and 75 , 000 lb . excavator for the first 3 weeks of construction . c . Water Truck for 2 weeks around week 2 or 3 . d . 40 , 000 lb . loader for the rema
- Status
- Closed
- Sector
- Road, Water Supply and Storage
- Location
- Alaska, United States of America
- Updated
- 3 Nov 2026
- Source
- Alaska Purchasing Group
ConstructChat
Ask ConstructChat about Nome Creek Stream Reclamation 2026
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | 1 . The intent of this RFQ is to provide the following equipment and operators . a . 30 , 000 lb . excavator for the duration . b . 30 - ton rock truck and 75 , 000 lb . excavator for the first 3 weeks of construction . c . Water Truck for 2 weeks around week 2 or 3 . d . 40 , 000 lb . loader for the remaining 3 to 5 weeks . e . 5 operators for the first 3 weeks . f . 4 operators for the remaining 3 to 5 weeks . 2 . Salcha Delta SWCD will provide a wheel loader , excavator , and a dozer for the contractor to use . 3 . The operator must be willing to be directed by Salcha - Delta SWCD engineer and the Bureau of Land Management project designer who will be onsite throughout the duration of the project . 4 . The project will involve mobilization of equipment to complete approximately 2 , 000 linear feet of in stream restoration and approximately five acres of floodplain grading at Nome Creek located on US Creek Road at MP 57 Steese Highway . ( See attachment C for the project map ). Equipment must be on site , ready to begin work on or before Monday , July 13 , 2026 . The construction will involve direct instruction from the project engineer on project construction sequencing , riparian transplant excavation and placement , rock and wood placement techniques , and other aspects of stream reclamation using Natural Channel Design methods ... |
Location
Country | United States of America (USA) |
State | Alaska |
Source
Source | Alaska Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Road, Water Supply and Storage |
Article published date | 2026-04-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Road tenders in United States of America
- RFP - Pro-Tem Hearing Examiner
- NEW TIRES RETREADS AND TIRE SERVICES
- Professional Construction Engineering and Inspection CEI Services for the Williamson Boulevard Widening
- Lincoln Avenue Wascher to Killarney Preliminary Engineering Section 220065800PV
- KilleenFort Hood Regional Airport KFHRA Terminal Apron Rehabilitation Phase II
- IFB 947902022JM Screening 10 Asphalt Filter Stone 8 Granite Double Washed
- IFB 914202022AM Street Sweeper Parts and Brooms
- IFB 843402021AB Hay Alfalfa and Wheat Straw for Norfolk Zoo
