logo

North Marina Redevelopment

Sector: Water Supply and Storage • Location: Mitn, United States of America

Source: Huron-Clinton Metropolitan Authority (MITN)

Tender
Closed

The work includes furnishing all labor , equipment and materials necessary to complete thework including North Marina Redevelopment to include the Installation of a steel sheet pilewall replacement seawall , and associated tieback assembly . Fabrication and installation offixed platforms . Construction of a floating dock

Status
Closed
Sector
Water Supply and Storage, Mass Transit, Steel, Manufacturing (Industrial), Car parking, Seaport, Cement, Automotive, Power Transmission, Power Generation (CCGT), Road
Location
Mitn, United States of America
Updated
3 Nov 2026
Source
Huron-Clinton Metropolitan Authority (MITN)

ConstructChat

Ask ConstructChat about North Marina Redevelopment

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “North Marina Redevelopment” is a tender record in Taiyo, linked to the Water Supply and Storage sector. It is issued for works, goods, or services related to Mitn, United States of America.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

The work includes furnishing all labor , equipment and materials necessary to complete thework including North Marina Redevelopment to include the Installation of a steel sheet pilewall replacement seawall , and associated tieback assembly . Fabrication and installation offixed platforms . Construction of a floating dock system with installation of associatedfendering , mooring cleats , signage , and safety ladders as designated . Installation of gangwayramps connecting the fixed platforms to the floating dock system . Placement of rip - rap supportstone and woody debris habitat structures , Installation of all associated anchorage devices forboth fixed and floating structures . Grading of the upland site in conjunction with new featuresand specified grades , slopes , swales etc . Furnishing and installation of a marina bathhousebuilding and adjacent concrete promenade and replacement sidewalks . Furnishing andinstallation of upland utilities to include sanitary , gas , electrical , and potable water systems asshown . Furnishing and installation of upland landscaping , native plantings , furnishings , andsite lighting as shown . Furnishing and installation of marine utility pedestals and fire pedestals . Installation of marina utility lines and features , including water , electrical , and dry fire , withconnections as necessary to existing site utilities . Existing asphalt parking lot improvements & access additions , and related work , and to provide all plant , labor , supplies , new and currentmaterials , transportation , equipment , and incidental and related items necessary to completethis Work . The Contractor agrees to perform the entire Work in accordance with : the Drawingsand Specifications entitled " North Marina Redevelopment ”, Lake St . Clair Metropark , MacombCounty , Michigan ", Project No . 502 - 23 - 702 ; this Contract Form ; and the Contract Documents . See more

Location

Country

United States of America (USA)

State

Mitn

Source

Source

Huron-Clinton Metropolitan Authority (MITN)

URL

More Details

Record type

Tender

Sector

Water Supply and Storage, Mass Transit, Steel, Manufacturing (Industrial), Car parking, Seaport, Cement, Automotive, Power Transmission, Power Generation (CCGT), Road

Article published date

2026-05-11

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender