logo

North Platte River Pedestrian Bridge

Bids closed May 2026 · Rocky Mountain E-Purchasing System · Last reported Apr 2026

Source: Rocky Mountain E-Purchasing System

Tender
Closed

The North Platte River Pedestrian Bridge Project consists of the construction of a new pedestrian bridge spanning the North Platte River in Casper , Wyoming . The project includes a signature steel arch bridge structure approximately 270 feet in length and 16 feet in width with a concrete deck , abutments

Status
Closed
Sector
Waste Processing and Treatment, Bridge, Steel, Water Supply and Storage, Cement
Location
Rocky Mountain E-Purchasing System, United States of America
Updated
3 Nov 2026
Source
Rocky Mountain E-Purchasing System

ConstructChat

Ask ConstructChat about North Platte River Pedestrian Bridge

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “North Platte River Pedestrian Bridge” is a tender record in Taiyo, linked to the Waste Processing and Treatment sector. It is issued for works, goods, or services related to Rocky Mountain E-Purchasing System, United States of America.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

The North Platte River Pedestrian Bridge Project consists of the construction of a new pedestrian bridge spanning the North Platte River in Casper , Wyoming . The project includes a signature steel arch bridge structure approximately 270 feet in length and 16 feet in width with a concrete deck , abutments and foundations on both the north and south sides of the river , and all associated site work including pathway connections , retaining walls , and site grading at both landings . Additional Description : The project also includes a bridge - hung 20 - inch water main approximately 210 feet in length , a bridge - hung 4 - inch sanitary sewer force main approximately 280 feet in length , a programmable LED lighting system , and pedestrian railing on both sides of the bridge . Work is divided into two phases , with Phase 1 covering substructure construction and procurement and storage of materials , and Phase 2 covering final installation , erection , and completion of all remaining work .

Location

Country

United States of America (USA)

State

Rocky Mountain E-Purchasing System

Source

Source

Rocky Mountain E-Purchasing System

URL

More Details

Record type

Tender

Sector

Waste Processing and Treatment, Bridge, Steel, Water Supply and Storage, Cement

Article published date

2026-05-06

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender