logo

North Shore State Parks Accessibility Improve

The scope, dates and status of this tender. A free account opens every field.

Source: Minnesota Purchasing Group

Tender
Closed

Project Overview The Minnesota Department of Natural Resources ( DNR ) Operations Services Division ( OSD ) and the Division of Parks and Trails ( PAT ) request proposals from interested consulting engineering firms for professional services to perform ALL work necessary to survey , design , prepare construction plans and

Status
Closed
Sector
Water Supply and Storage, Car parking, Commercial, Cement, Automotive, Road
Location
Minnesota, United States of America
Updated
3 Nov 2026
Source
Minnesota Purchasing Group

ConstructChat

Ask ConstructChat about North Shore State Parks Accessibility Improve

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “North Shore State Parks Accessibility Improve” is a tender record in Taiyo, linked to the Water Supply and Storage sector. It is issued for works, goods, or services related to Minnesota, United States of America.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

Project Overview The Minnesota Department of Natural Resources ( DNR ) Operations Services Division ( OSD ) and the Division of Parks and Trails ( PAT ) request proposals from interested consulting engineering firms for professional services to perform ALL work necessary to survey , design , prepare construction plans and specifications , provide construction inspection , and contract administration services for accessibility improvements at Tettegouche and Grand Portage State Parks . The Baptism River Campground is a 34 - campsite recreational campground within Tettegouche State Park . The campground infrastructure consists of 3400 ft of bituminous pavement road , 21 campsites with electric service , vault toilets , and a shower building . Adjacent to the campground is a trailhead parking facility that can accommodate 22 single car vehicles . The project at Tettegouche State Park will involve full bituminous road reconstruction , parking improvements , electrical improvements , identified accessible pedestrian routes , reconstruction of water spigots , and required stormwater treatment improvements throughout the Baptism River Campground and trailhead facility . The High Falls Trail at Grand Portage State Park is a popular 2300 ft long paved bituminous pedestrian trail from the park visitor center to the High Falls of the Pigeon River . Bituminous pavement , minor drainage structures , benches associated with the trail , and a large wooden box culvert are the infrastructure components of the trail . The project at Grand Portage State Park will consist of full bituminous pedestrian path reconstruction , minor path realignment , replacement of minor drainage structures , removal and replacement of major wood box culvert drainage structure , and minor concrete accessibility improvements . All infrastructure will be reconstructed to meet the current applicable ADA standards . All survey and CAD work that the DNR has completed for the Tettegouche State Park Trailhead Facility will remain within the existing infrastructure footprint for each facility . Stormwater requirements of the Minnesota Pollution Control Agency ( MPCA ) Construction Stormwater Permit , as well as DNR Stormwater Management guidelines will need to be incorporated into this project . This project is funded through the Get Out More state funding to modernize outdoor recreation experiences . All infrastructure designed and constructed must meet accessibility guidelines throughout the entire project . The project will be advertised and bid by the Department of Natural Resources . An overall summary of the infrastructure requested to be designed is as follows : Tettegouche State Park - Baptism River Campground Reconstruction of 2300 LF of up to 16 ft wide bituminous one - way road serving the campground . Bituminous removal ( milling , excavation , or reclamation ), structural section reconstruction , drainage , and new bituminous pavement . Evaluate and Design reconstruction and / or resurfacing options on 1 , 100 LF of campground road providing access to the one - way campground loop . Accessible parking improvements at the current campground shower building . Accessible route to campground shower building from accessible parking and accessible campsites . Electrical improvements at 5 current electric serviced campsites with existing service breaks or functionality issues . Up to 2 accessible vault toilet ( supplied by DNR ) installations 6 - 8 Accessible campsites ( walk in , electric , and non - electric , 2 minimum per type ) 1 Accessible water spigot ( design standard supplied by the DNR ) Full reconstruction of a 22 - site trailhead bituminous parking facility to accessibility code , with associated stormwater improvements . Grand Portage State Park - High Falls Trail Full bituminous trail reconstruction of a 2300 ft , 8 ft wide trail . Bituminous removal ( milling , reclamation , or excavation ), base reconstruction , and new bituminous surfacing Minor trail re - alignment of 200 to 300 ft of trail , with a maximum displacement from the existing centerline of 10 ft . Accessible landings , resting areas , and benches

Location

Country

United States of America (USA)

State

Minnesota

Source

Source

Minnesota Purchasing Group

URL

More Details

Record type

Tender

Sector

Water Supply and Storage, Car parking, Commercial, Cement, Automotive, Road

Article published date

2026-05-02

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender