Notice Of Intent - Sole Source Award To Time Manufacturing Co.
The scope, dates and status of this tender. A free account opens every field.
Source: SAM.gov
The purpose of this special notice is to issue notice of intent to restrict competition for certain commercial products under the simplified acquisition threshold. The Washington Aqueduct has a requirement for the acquisition and delivery of one Versalift SST-40-EIH insulated end-mounted 40 ft. 12.2m telescopic aerial platform lift 45 ft. working height, 27 ft. 9 in. horizontal reach with a 50 kV
- Status
- Prospective
- Sector
- Residential, Government, Manufacturing (Industrial), Aerospace & Defense, Power Transmission, Power Generation (CCGT), Commercial
- Location
- United States of America
- Updated
- 3 Nov 2026
- Source
- SAM.gov
ConstructChat
Ask ConstructChat about Notice Of Intent - Sole Source Award To Time Manufacturing Co.
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | special notice |
Taiyo status | Prospective |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | The purpose of this special notice is to issue notice of intent to restrict competition for certain commercial products under the simplified acquisition threshold. The Washington Aqueduct has a requirement for the acquisition and delivery of one Versalift SST-40-EIH insulated end-mounted 40 ft. 12.2m telescopic aerial platform lift 45 ft. working height, 27 ft. 9 in. horizontal reach with a 50 kV rated liner and cover, fully integrated and installed on a 2026 Ford F-550 Reg Cab 4x4 chassis with a 132 inches long x 40 inches high x 94 inches wide service body, associated accessories, and delivery to Washington, DC. Authority to Restrict Competition: 41 U.S.C. 1901: Simplified acquisition procedures, as implemented by RFO 12.102. Reason for Authority Cited: RFO 12.102a allows the Contracting Officer KO to restrict competition when procuring commercial products under the SAT when they determine that only one source is reasonably available to fulfill the requirement. The Government requires an insulated aerial lift vehicle tested and certified for electrical work at 46 KV and below in accordance with ANSI A92.2 requirements to support immediate utility, maintenance, and facility operations. Standard manufacturing lead times for a custom-built chassis and integrated aerial lift of this magnitude typically span several months to over a year. According to market research, contractor Time Manufacturing Co, a large business, has an exact, fully compliant unit in stock and available for immediate delivery. Procuring this specific in-stock unit avoids the extensive operational delays and administrative costs associated with a lengthy manufacturing process, directly satisfying the Governments critical schedule. Because no other known contractor has a fully compliant, certified vehicle in stock and available for immediate delivery, it is determined that only one source is reasonably available to provide this commercial product valued below the SAT. |
Original sector | Not Identified |
Location
Country | United States of America (USA) |
Source
Source | SAM.gov |
URL |
More Details
Record type | Tender |
Sector | Residential, Government, Manufacturing (Industrial), Aerospace & Defense, Power Transmission, Power Generation (CCGT), Commercial |
Article published date | 2026-08-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
