Novation contract awarded under Directive 2014/25/EU
Contract award notice · European Union · Last reported Mar 2026
Source: TED Europa
Ørsted Wind Power A/S intends to give its approval to the novation (transfer) of the agreement from OPUS Marine GmbH to its parent company OEG Marine Ltd. The novation is requested due to an internal restructuring of the supplier group, where we have been informed that OPUS Marine GmbH will cease trading. Further, Ørsted have been informed that all contracts and commitments with other stakeholders
- Status
- Closed
- Sector
- Wind, Power Generation (CCGT)
- Location
- Unknown (Europe)
- Updated
- 3 Nov 2026
- Source
- TED Europa
ConstructChat
Ask ConstructChat about Novation contract awarded under Directive 2014/25/EU
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | contract award notice |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | Ørsted Wind Power A/S intends to give its approval to the novation (transfer) of the agreement from OPUS Marine GmbH to its parent company OEG Marine Ltd. The novation is requested due to an internal restructuring of the supplier group, where we have been informed that OPUS Marine GmbH will cease trading. Further, Ørsted have been informed that all contracts and commitments with other stakeholders have been or will be transferred to OEG Marine Ltd. Based on this information, Ørsted Wind Power A/S assesses that the transfer is part of an internal restructuring of the supplier, which does not constitute a significant change of the contract as described in article 89 (1), litra d, and that Ørsted Wind Power A/S therefore can approve the novation in accordance with the public procurement rules including the principles of transparency and equal treatment as also envisaged in preamble 116 of the utilities directive. Further, the amendment is not assessed to be a fundamental change of the contract. Accordingly, Ørsted Wind Power A/S does not consider the new agreement as an agreement that has been awarded directly without conducting an EU tender procedure, but that it is a permissible amendment as described in article 89 (1), litra d. |
Original sector | Transport services (excl. Waste transport) |
Location
Country | Unknown (Europe) |
Source
Source | TED Europa |
URL |
More Details
Record type | Tender |
Sector | Wind, Power Generation (CCGT) |
Article published date | 2026-03-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Wind tenders in European Union
- Supplementary information regarding use of Achilles Utilities Nordics & Central Europe qualification system by Ørsted and Ørsted Group including the entities mentioned in section 1 and 2.1.4 General information
- Contrato de Sobreequipamento do Parque Eólico do Loiral III e Reequipamento do Parque Eólico do Paul
- Contrato de Sobreequipamento do Parque Eólico do Loiral III e Reequipamento do Parque Eólico do Paul
- Outer Dowsing
- Assessment of strategic stakeholder needs, environmental conflicts, and acceleration potentials in energy network planning and implementation to safeguard the Wadden Sea World Heritage Site
- Supplementary information regarding use of Achilles Utilities Nordics & Central Europe qualification system by Ørsted and Ørsted Group including the entities mentioned in section 1 and 2.1.4 General information
- Fourniture de gaz médicaux pour les établissements adhérant au GCS Achats du Centre des départements : Indre et Loire 37 et Loiret 45
- Magnet Joint Qualification System (Magnet JQS) - Notification of qualification system
