logo

Nrcs-Ma Tyler Dam Rehabilitation Project Floodwater Retarding Dam

Sector: Hydro • Location: Massachusetts, United States of America

Source: SAM.gov

Tender
Combined Synopsis/Solicitation

Please see Attachment 1 Specificaitons document for further details. Tyler Dam Rehabilitation Worchester County, MA Site Showing on: Wednesday, May 27?? at 10:00 AM at the site 200 Robin Hill Street Marlborough, MA 01752 The work consists of rehabilitating the existing dam to be in compliance with current safety and performance standards. Engineering studies identified that the dam has inadequate

Status
Prospective
Sector
Hydro, Raw Materials, Commercial, Residential, Cement, Road
Location
Massachusetts, United States of America
Updated
3 Nov 2026
Source
SAM.gov

ConstructChat

Ask ConstructChat about Nrcs-Ma Tyler Dam Rehabilitation Project Floodwater Retarding Dam

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Nrcs-Ma Tyler Dam Rehabilitation Project Floodwater Retarding Dam” is a tender record in Taiyo, linked to the Hydro sector. It is issued for works, goods, or services related to Massachusetts, United States of America.

Participants

Not available for this record.

Status

Original status

combined synopsis/solicitation

Taiyo status

Prospective

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

Please see Attachment 1 Specificaitons document for further details. Tyler Dam Rehabilitation Worchester County, MA Site Showing on: Wednesday, May 27?? at 10:00 AM at the site 200 Robin Hill Street Marlborough, MA 01752 The work consists of rehabilitating the existing dam to be in compliance with current safety and performance standards. Engineering studies identified that the dam has inadequate auxiliary spillway capacity that would result in overtopping and breaching of the embankment during the probable maximum flood. The major items of work include: excavating the approach channel upstream of the auxiliary spillway drop structure by 2.5 feet to improve flow efficiency; installing a geosynthetic clay liner in the auxiliary spillway approach; raising portions of the dam embankment crest to provide additional freeboard and create a uniform crest elevation; constructing a concrete crest wall to provide freeboard and prevent overtopping at a low spot where Robin Hill Street intersects the top of dam; replacing concrete joint sealant above the waterline in the auxiliary spillway and in the principal spillway conduit; replacing existing chain-link fencing surrounding the auxiliary spillway drop structure; and removing trees within 20 feet of the right upstream embankment groin.

Original sector

Construction

Location

Country

United States of America (USA)

State

Massachusetts

Source

Source

SAM.gov

URL

More Details

Record type

Tender

Sector

Hydro, Raw Materials, Commercial, Residential, Cement, Road

Article published date

2026-05-20

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender