NUN - Strategic Flood Risk Assessment
Location: United Kingdom
Source: Open Contracting Data Standard (OCDS)
The Planning Policy team at Nuneaton and Bedworth Borough Council is responsible for guiding development, through plan-making, for Nuneaton and Bedworth Borough. The Borough’s Development Plan currently comprises of the newly adopted Borough Plan Review (2021-2039), which was adopted on 10th December 2025, a Gypsy and Traveller Site Allocations Development Plan Document, the Warwickshire Minerals
- Status
- Closed
- Location
- United Kingdom
- Updated
- 3 Nov 2026
- Source
- Open Contracting Data Standard (OCDS)
ConstructChat
Ask ConstructChat about NUN - Strategic Flood Risk Assessment
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | active |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | The Planning Policy team at Nuneaton and Bedworth Borough Council is responsible for guiding development, through plan-making, for Nuneaton and Bedworth Borough. The Borough’s Development Plan currently comprises of the newly adopted Borough Plan Review (2021-2039), which was adopted on 10th December 2025, a Gypsy and Traveller Site Allocations Development Plan Document, the Warwickshire Minerals Local Plan (2018-2032) and the Warwickshire Waste Core Strategy Adopted Local Plan (2013-2028). This contract is for a Strategic Flood Risk Assessment (SFRA) – Level 1. The National Planning Policy Framework (NPPF) (December 2024) requires Local Planning Authorities to produce a SFRA to inform strategic policies, in their Local Plans. In accordance with the NPPF (December 2024) and transitional arrangements within paragraphs 234-237, Nuneaton and Bedworth Borough Council is required to commence an immediate further review now the Borough Plan Review (2021-2039) has been adopted. This further review, in the form of a new Local Plan, will need to address the shortfall between the Borough Plan Review housing requirement of 545 dwellings per annum and the government’s new standard method requirement of 756 dwellings per annum. The SFRA – Level 1 will be a vital piece of evidence to enable the selection of the most appropriate locations for growth in the next Local Plan. |
Location
Country | United Kingdom (UK) |
Source
Source | Open Contracting Data Standard (OCDS) |
URL |
More Details
Record type | Tender |
Article published date | 2026-03-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More infrastructure tenders in United Kingdom
- Submarine HV cable rock protection
- Submarine HV cable rock protection
- 2024-01-05 09:00 - QBE129 Haverhill to Riverwalk School, Bury St Edmunds
- Usługa kompleksowej organizacji udziału przedsiębiorstw z województwa łódzkiego w charakterze wystawców na targach branży spożywczej IFE 2026
- Tender for Play Area Works within the Borough of Ards and North Down
- SUMIT Project Hardware and Connectivity Services
- Laboratory Consumables and Chemicals
- OSPAR Relational Database for the implementation of Recommendations on the List of threatened and/or declining habitats and species
