Oak Hill Roof Replacement
The scope, dates and status of this tender. A free account opens every field.
Source: West Virginia Purchasing Group
Remove and discard existing roof membrane , insulation , edge metal , and flashings to expose the metal deck . • Inspect the deck for deterioration / damage and perform any necessary repair or replacement at a cost per square foot unit basis . • Raise curbs , perimeter blocking , plumbing stacks , utility lines , and
- Status
- Closed
- Sector
- Metal, Commercial, Power Transmission, Power Generation (CCGT)
- Location
- West Virginia, United States of America
- Updated
- 3 Nov 2026
- Source
- West Virginia Purchasing Group
ConstructChat
Ask ConstructChat about Oak Hill Roof Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | Remove and discard existing roof membrane , insulation , edge metal , and flashings to expose the metal deck . • Inspect the deck for deterioration / damage and perform any necessary repair or replacement at a cost per square foot unit basis . • Raise curbs , perimeter blocking , plumbing stacks , utility lines , and equipment supports providing sufficient flashing height to meet manufacturer ’ s requirements and accommodate new insulation thicknesses . • Mechanically attach an average of R30 polyisocyanurate insulation . • Install ½ ” gypsum coverboard to the insulation with high - rise insulation adhesive . • Install modified bitumen base and cap sheets in cold adhesive throughout the field . • Three - course all cap flashing seams with polyester reinforcement and reflective mastic . • Apply Fluid - applied coating along the length of the roof edge at the gutter , extending 6 ’ up the slope of the roof and terminating . • Tape off a straight line 6 ’ from the gutter edge prior to coating to ensure a straight , clean termination line . • Apply an aluminized coating over the field and flashing cap sheets 30 - days after cap sheet installation . • Apply aluminized coating on all field and flashing cap sheets , stopping at the fluid - applied coating on the low slope side . • Liquid Flash all roof penetrations larger than 2 ” in diameter . • Install pitch pockets on all roof penetrations smaller than 2 ” in diameter . • Install new shop fabricated gutters and downspouts where the existing gutters and downspouts were removed . • Install new counterflashings and new metal coping around the perimeter of the roof , replacing the original metal coping in kind . • The manufacturer ' s 30 year , NDL warranty will be provided upon completion |
Location
Country | United States of America (USA) |
State | West Virginia |
Source
Source | West Virginia Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Metal, Commercial, Power Transmission, Power Generation (CCGT) |
Article published date | 2026-05-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Metal tenders in United States of America
- Token Creek Roof Replacements
- HVAC Ice Machine Servicing and Sheet Metal Fabrication
- Jail Courthouse Walkway Project
- RFP 887702021MF Rapid Response Fire Boat for Norfolk FireRescue
- Various Locations Sewer Replacement No. 9 [BID TABULATION]
- Millbrae Warehouse Loading Dock Repair
- Biosolids Digester Facilities - Southeast Treatment Plant T-...
- Electrical (C-10 License), San Francisco, San Mateo, Santa C...
