logo

Offender Communication Services

Closed · Missouri · Last reported Jan 2026

Source: Missouri Purchasing Group

Tender
Closed

The state agency may , at no additional charge to the state , require the offender communication system ’ s contractor to install new systems at facilities that are not currently utilizing the system ( i . e . new correctional facilities ). The offender communication system must utilize rigid conduit or steel enclos

Status
Closed
Sector
Broadband, Telecommunications, Power Generation (CCGT), Steel, Commercial, Residential
Location
Missouri, United States of America
Updated
3 Nov 2026
Source
Missouri Purchasing Group

ConstructChat

Ask ConstructChat about Offender Communication Services

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Offender Communication Services” is a tender record in Taiyo, linked to the Broadband sector. It is issued for works, goods, or services related to Missouri, United States of America.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

The state agency may , at no additional charge to the state , require the offender communication system ’ s contractor to install new systems at facilities that are not currently utilizing the system ( i . e . new correctional facilities ). The offender communication system must utilize rigid conduit or steel enclosure for all cable runs , as determined by the state agency . All offender communication system wiring distribution shall become the property of the state agency at the conclusion of the contract . The offender communication system must provide a shutdown of all communication services within fifteen ( 15 ) seconds via a physical kill switch ( es ) at a location within each facility as determined by the state agency . The system ’ s infrastructure must be scalable by design in order to accommodate increased capacity without service disruption . The system must include capacity tracking and management tools to determine when capacity needs to be increased . The system shall include sufficient redundancy and fail - over devices so failure of a single component does not affect overall system availability . The state agency may request to also utilize the offender communication system contractor ’ s wireless network for other agency operations at no cost to the state agency . Upon implementation , the system shall have the ability to segregate agency operations from the network used by offenders via a virtual local area network ( VLAN ). Use of the system for agency operations shall not disrupt the performance of the overall network . Wireless Access Points ( WAPs ) – The offender communication system contractor shall be responsible to provide and install all WAPs required to provide coverage to ensure connectivity in all cells , living areas , and other areas as determined by the state agency . The WAPs must be provided , installed , and maintained by the contractor at no cost to the State . The contractor shall relocate , add , modify and remove WAPs at no cost after receiving 30 days ’ notice by the state agency . Firewalls - The contractor shall provide their own firewall / IDS system to secure ingress / egress traffic on the offender communication system circuit separate from the firewall securing access from the offender communication system to the state agency network . Uninterruptible Power Supply ( UPS ) - The contractor shall provide all equipment necessary to maintain 100 % functionality for the contractor ’ s system equipment to include routers , firewalls , servers , and ISP connections for a minimum of ten ( 10 ) minutes due to a loss of commercial power in the state agency . The contractor must provide a system capable of full recovery from a power outage automatically or remotely once power is restored . The contractor is advised that the state agency performs tests of the backup generators at least once per month . During this testing the power will be temporarily disabled throughout the facility , including the telecommunications room . Outages resulting from backup generator testing will not be considered a stop clock condition in calculating Service Level Agreements ( SLAs ). Cabling and Power Installation - The contractor shall provide , install , and test all data wiring required to provide data and voice services . The contractor shall provide CAT 6 ( 550 MHz ) rated wiring , at a minimum . Infrastructure Network Diagram - The contractor shall provide hard and electronic copies of network infrastructure cabling drawings and / or diagrams to include one ( 1 ) half size , one ( 1 ) full size , and / or one ( 1 ) electronic to the state agency prior to the beginning of work at each installation site . These specifications , drawings and / or diagrams shall be subject to approval by the state agency prior to the commencement of work . Such approval does not relieve the contractor from the responsibility of meeting all requirements of the contract . All drawings and / or diagrams that contain special symbols either of a product or technically specific nature shall contain legends denoting the meaning of the symbols . The contractor is responsible for updating any provided drawings if any changes are made during the life of the contract . Unless otherwise stated , the final approved drawings and / or diagrams shall be delivered to the state agency at least 30 calendar days prior to installation at each state agency facility . The contractor shall provide the final as - built drawings one ( 1 ) full size , one ( 1 ) half size , and one ( 1 ) electronic to the state agency for approval . The delivered drawings and diagrams must reflect all changes made during the installation . The contractor shall identify the changes by “ clouding ” the original design to show both the original design and the alterations made . Implementation Requirements : The contractor shall attend a kick - off meeting held in Jefferson City , Missouri , with designated state agency personnel within seven ( 7 ) calendar days of notice to proceed with services by the state agency . Weekly implementation status meetings must be held at a date and time determined and agreed to by the state agency and the contractor . The weekly implementation status meetings shall be conducted remotely , unless the state agency requests an in - person meeting . The contractor shall provide the state agency an implementation plan with project schedule within thirty ( 30 ) calendar days after award of contract . The project schedule shall be updated and sent to the state agency weekly . The plan shall be coordinated with the current service provider to ensure minimized disruption in service . The contractor shall complete the described work within one hundred and twenty ( 120 ) calendar days after receipt of the state agency ’ s written approval of the plan . The project schedule shall include tasks , durations , deliverables , responsible parties , dependencies , start and end dates by site , schedule variances , and completion status for the following milestones : On - site inspection ; Delivery of equipment ; Infrastructure installation ; Network Installation Hardware installation ; Software installation ;

Location

Country

United States of America (USA)

State

Missouri

Source

Source

Missouri Purchasing Group

URL

More Details

Record type

Tender

Sector

Broadband, Telecommunications, Power Generation (CCGT), Steel, Commercial, Residential

Article published date

2026-04-29

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender