Ogden-Hinckley Airport (Ogd) Air Traffic Control Tower (Atct) Design-Build
One of 9,955 tenders Taiyo tracks in Utah.
Source: SAM.gov
*Amendment 3 to solicitation 697DCK-25-R-00437 was issued on November 6, 2025. The purpose of amendment 3 is to incorporate questions and answers 3. All other terms and conditions remain unchanged. See Amendment 3 for all changes ------------------------------------------------------------------------------------------------------------------------------- *Amendment 2 to solicitation 697DCK-25-R-0
- Status
- Closed
- Sector
- Airport, Aerospace & Defense, Residential, Commercial
- Location
- Ogden, Utah, United States of America
- Updated
- 3 Nov 2026
- Source
- SAM.gov
ConstructChat
Ask ConstructChat about Ogden-Hinckley Airport (Ogd) Air Traffic Control Tower (Atct) Design-Build
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | *Amendment 3 to solicitation 697DCK-25-R-00437 was issued on November 6, 2025. The purpose of amendment 3 is to incorporate questions and answers 3. All other terms and conditions remain unchanged. See Amendment 3 for all changes ------------------------------------------------------------------------------------------------------------------------------- *Amendment 2 to solicitation 697DCK-25-R-00437 was issued on November 3, 2025. The purpose of amendment 2 is to extend the proposal due date to November 14, 2025 no later than 1700 ET. This amendment will also incorporate questions and answers 2. All other terms and conditions remain unchanged. See Amendment 2 for all changes --------------------------------------------------------------------------------------------------------------------------------- *Amendment 1 to solicitation 697DCK-25-R-00437 was issued on October 17, 2025. The purpose of amendment 1 is to update past performance criteria, incorporate questions and answers, and add attachment 1 and attachment 13 to section J. All other terms and conditions remain unchanged. See Amendment 1 for all changes. -------------------------------------------------------------------------------------------------------------------------------- ***A FINAL NEPA REVIEW HAS NOT BEEN CONDUCTED. NTP (Notice to proceed) will not be issued until we have a favorable NEPA finding for this site.*** Contractor shall furnish all labor, materials, services, equipment, insurance, security notifications, licenses, permits, and fees in accordance with applicable Federal, State, and local regulatory requirements to DESIGN AND BUILD A NEW AIRPORT TRAFFIC CONTROL TOWER (ATCT) FACILITIES OGDEN-HINCKLEY AIRPORT (OGD) IN OGDEN, UTAH. All work shall be in accordance with the specifications, drawings, contract clauses, and wage rates, as described in this Solicitation Due to their file sizes (as they are too large to transmit via email) interested offeror's must email both (Rodgers.L.Cox@faa.gov) and (Sam.G.Culberth@faa.gov) to request access to the FAA's KSN Site to download all Section J Attachments. Please provide name, phone #, and email address for this KSN P.O.C. (limit one KSN P.O.C. per perspective offeror). |
Original sector | Construction |
Location
Country | United States of America (USA) |
State | Utah |
City | Ogden |
Source
Source | SAM.gov |
URL |
More Details
Record type | Tender |
Sector | Airport, Aerospace & Defense, Residential, Commercial |
Article published date | 2025-11-07 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Airport tenders in United States of America
- Fuel Tank Inspection and Repair Services
- Tacoma Narrows Airport TIW Taxiway Relocation Improvements Project
- Cargo Apron Reconstruction and Replacement of Runway 927 with a Taxiway
- Fall Protection for Airport Jet Bridges
- Notice of Intent to Award a NonCompetitive Procurement for Siemens Logistics High Speed Diverters
- This is a Notification Only Continuing OnCall Architecture and Engineering Consulting Services W00486
- Electronic Gate Replacement
- INFORMATION TECHNOLOGY IT CONTINUING CONSULTING SERVICES
