Ok Fw Sqh T501(1) Rehab Riverbank & Sandtown Wood Trail
Sector: Water Supply and Storage • Location: Vian, Oklahoma, United States of America
Source: SAM.gov
PROJECT NUMBER: OK FW SQH T501(1) PROJECT NAME: REHAB RIVERBANK & SANDTOWN WOODS TR PROJECT DESCRIPTION: The Rehab Riverbank and Sandtown Woods Trail project is located in the Sequoyah National Wildlife Refuge in eastern Oklahoma approximately 90 miles southeast of Tulsa, Oklahoma. The Refuge sits at the confluence of the Arkansas and Canadian Rivers. The Refuge was established as an overlay of th
- Status
- Closed
- Sector
- Water Supply and Storage, Bridge, Road, Residential, Commercial, Hydro, Cement
- Location
- Vian, Oklahoma, United States of America
- Updated
- 3 Nov 2026
- Source
- SAM.gov
ConstructChat
Ask ConstructChat about Ok Fw Sqh T501(1) Rehab Riverbank & Sandtown Wood Trail
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | solicitation |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | PROJECT NUMBER: OK FW SQH T501(1) PROJECT NAME: REHAB RIVERBANK & SANDTOWN WOODS TR PROJECT DESCRIPTION: The Rehab Riverbank and Sandtown Woods Trail project is located in the Sequoyah National Wildlife Refuge in eastern Oklahoma approximately 90 miles southeast of Tulsa, Oklahoma. The Refuge sits at the confluence of the Arkansas and Canadian Rivers. The Refuge was established as an overlay of the U.S. Army Corps of Engineers (USACE) lands along Robert S. Kerr Reservoir created by the Robert S. Kerr Dam. The project consists of improving visitor access and experience by repairing damaged areas of the bank, protect existing trail infrastructure, and to repair sections of trail damaged after the 2019 flooding event. This includes stabilization and repair of approximately 1,150 linear feet of riverbank and repair/reconstruction of approximately 500 linear feet of 6-foot-wide asphalt trail. PRINCIPAL WORK ITEMS: 2,700 CUYD of earthwork 2,700 CUYD of place riprap 60 TON of asphalt concrete pavement 195 CUYD of topsoil. The project work will be performed in a grassed upland area that contains some wooded vegetation offset from the riverbank. ANTICIPATED SCHEDULE: Advertisement – September 2025 Award – November 2025 Contract Completion – March 2026 ESTIMATED COST RANGE: Total estimated cost between $700,000 and $2,000,000. |
Original sector | Construction |
Location
Country | United States of America (USA) |
State | Oklahoma |
City | Vian |
Source
Source | SAM.gov |
URL |
More Details
Record type | Tender |
Sector | Water Supply and Storage, Bridge, Road, Residential, Commercial, Hydro, Cement |
Article published date | 2025-11-19 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Water Supply and Storage tenders in United States of America
- RFP - Thurston County Lake Management Districts Submerged Aquatic Vegetation Control
- Coatings for Wet Well and Manholes
- Sole Source for Wedeco UV BulbsBallets
- Security Hardware Services
- Chambers Creek Regional Wastewater Treatment Plant BNR Aeration Basin Airflow Meters
- Se Dixie Highway County Road A1A Utility Relocation Project
- UNPAINTED SNOW FENCE AND DUNE GRASS NO II
- PreQualification of Bidders for Chaboya Improvements
