OKLAHOMA AVENUE MIS CAPACITY IMPROVEMENTS
Bids closed Apr 2026 · Wisconsin · Last reported Mar 2026
Source: Wisconsin Purchasing Group
Sealed Bids for the Construction of the Oklahoma Avenue MIS Capacity Improvements , Contract No . C03013C01 located in the City of Milwaukee , Wisconsin , and the City of West Allis , Wisconsin . The contractor will be responsible for : · Various lengths of 8 ", 10 ", 12 " and 48 " diameter sewer in tunnel , open c
- Status
- Closed
- Sector
- Waste Processing and Treatment, Water Supply and Storage, Cement, Tunnel, Power Transmission, Power Generation (CCGT), Road
- Location
- Wisconsin, United States of America
- Updated
- 3 Nov 2026
- Source
- Wisconsin Purchasing Group
ConstructChat
Ask ConstructChat about OKLAHOMA AVENUE MIS CAPACITY IMPROVEMENTS
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | Sealed Bids for the Construction of the Oklahoma Avenue MIS Capacity Improvements , Contract No . C03013C01 located in the City of Milwaukee , Wisconsin , and the City of West Allis , Wisconsin . The contractor will be responsible for : · Various lengths of 8 ", 10 ", 12 " and 48 " diameter sewer in tunnel , open cut , and open cut or jacked pipe · 6 MMSD concrete manholes · 4 City of Milwaukee precast concrete manholes · 1 City of West Allis precast concrete manhole · Modifications to or the abandonment of 6 manholes · The abandonment of various lengths of 12 ", 15 " and 21 " diameter sewer · The decommissioning of a pump station , including an offsite 125 - kilowatt generator ( to become the property of the Contractor ). · Approximately 175 linear feet of 6 - inch or 8 - inch diameter water main . The Contractor shall perform all associated pavement and surface restoration , utility relocation , erosion control , traffic control , and geotechnical monitoring in accordance with the Contract Documents . The work involves facilities owned by the District , the City of Milwaukee , and the City of West Allis . The work will occur along South 72nd Street , between South Honey Creek Drive and West Oklahoma Avenue , and along West Oklahoma Avenue , between South 72nd Street and South 77th Street . |
Location
Country | United States of America (USA) |
State | Wisconsin |
Source
Source | Wisconsin Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Waste Processing and Treatment, Water Supply and Storage, Cement, Tunnel, Power Transmission, Power Generation (CCGT), Road |
Article published date | 2026-05-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Waste Processing and Treatment tenders in United States of America
- Coatings for Wet Well and Manholes
- Sole Source for Wedeco UV BulbsBallets
- Chambers Creek Regional Wastewater Treatment Plant BNR Aeration Basin Airflow Meters
- Annual Construction Contract For Utility Replacement 2022A
- FY23 Sewer Rehabilitation
- Fire Station 32 ADA Restroom Improvements
- Foothills Trail East Puyallup McMillin Trailhead Improvements
- Pipeline Trail Phase 1 Project
