logo

Olympic Park - Walkway Repairs Rebid

Sector: Road • Location: United States

Source: miamidade

Tender
Open

"1. Scope of Work – Furnish all labor, equipment and materials required to repair the asphalt walkways and various concrete pads throughout Olympic Park located at 8601 SW 152 Avenue, Miami, FL 33193. The work includes demolition, root pruning, debris removal, base compaction of approximately 865 SF of existing concrete walkway; installation of approximately 865 SF of new concrete walkway; and r

Status
Bidding
Sector
Road, Cement, Residential
Location
United States of America
Updated
3 Nov 2026
Source
miamidade

ConstructChat

Ask ConstructChat about Olympic Park - Walkway Repairs Rebid

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Olympic Park - Walkway Repairs Rebid” is a tender record in Taiyo, linked to the Road sector. It is issued for works, goods, or services related to United States.

Participants

Not available for this record.

Status

Original status

open

Taiyo status

Bidding

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

"1. Scope of Work – Furnish all labor, equipment and materials required to repair the asphalt walkways and various concrete pads throughout Olympic Park located at 8601 SW 152 Avenue, Miami, FL 33193. The work includes demolition, root pruning, debris removal, base compaction of approximately 865 SF of existing concrete walkway; installation of approximately 865 SF of new concrete walkway; and raising/regrading approximately 1020 SF of existing brick pavers. See below for more details: a. Attachment 1 – Location shows the general location of Olympic Park. Prior to submitting a bid, the contractor is to visit the work site and become familiar with the work. The site is in a county park and can be visited by the contractor at any time during open park hours. b. Attachment 2 – Sketches Location divides the park into 3 sections and shows the locations of Sketch A (north side of the park), Sketch B (central), and Sketch C (south side of the park). c. Attachment 3 – Sketch A; Attachment 4 – Sketch B; and Attachment 5 – Sketch C shows the scope of work for each of the three sections. d. The contractor is required to perform their own site take-off (field measurements) to complete all work. Any dimensions or quantities depicted in this RPQ are approximate and are not to be used for bid purposes. e. The contractor shall abide by the PWD Manual 2 Specifications for Portland cement concrete. Attached are the following specifications: i. PWD Manual Part 1A ii. PWD Manual Part 1B iii. PWD Manual Part 2A iv. PWD Manual Part 2B f. Sketches A, B and C depict the locations of the following work descriptions: i. Replace (Demo Concrete; Root Prune; Regrade/Compact Existing Base; and Install Concrete Walkway) – The Contractor shall saw cut straight the concrete walkway full width at the beginning and end of the removal area. The thickness of the existing concrete walkway is around 6-inches. All of the concrete spoils shall be removed from the site and be properly disposed. The contractor shall root prune, remove the debris, and properly dispose of the debris material. The Contractor shall regrade and compact the base, and install new concrete walkway. The Portland cement concrete shall be a minimum thickness of 6-inches, 3000 PSI with a polypropylene fiber mesh additive, and the finished surface shall have a slip resistant broom finish. The Contractor shall create controlled joints every 8’ along the 8’ wide walkway. The controlled joints shall be either saw cut within 24 hours of the concrete pour or trawled into the wet concrete prior to curing. ii. Temporary Remove Pavers – In Sketch A, the intent of this work is to raise the existing brick pavers that encircle the fitness court to be level and flush to the two concrete ribbons located on both sides of the pavers. Work includes temporarily removing the brick pavers and storing them securely while not breaking them. Pressure wash the brick pavers to clean the surface. Root prune the base (if needed) and remove all organic debris. Add clean sand from a quarry and regrade the base to the proper elevation. Reinstall existing brick pavers. Add addition thin layer of clean sand on top of newly reinstalled existing brick pavers and compact surface with vibratory compactor to lock the pavers. Sweep clean the brick paver surface. The top of the newly installed/compacted pavers shall be flush to the surrounding concrete ribbons. g. Upon completion of the concrete walkways and brick paver work, the contractor shall install 70/30 (sand/soil) mix and sod on all areas that the contractor disturbed due to their construction activities. Use fine hand grading to bring mixture/sod to an elevation approximately 1” to 2” below the top of surface of the broom finished concrete. If there was no grass in the disturbed area prior to work, then the contractor shall place the 70/30 mix at a 3:1 slope to help make the walkway ADA compliant. Sod will only be placed in the areas where grass existed prior to the contractor starting their work. h. The contractor shall protect the park assets at all times, especially the concrete walkways. Any new damage caused by the contractor’s equipment shall be replaced at the contractor’s expense in a similar manner outlined in this RPQ’s scope of work.

Original sector

Services

Location

Country

United States of America (USA)

Source

Source

miamidade

URL

More Details

Record type

Tender

Sector

Road, Cement, Residential

Article published date

2026-10-09

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender