logo

On - Call Plumbing Services

One of 10,000+ tenders Taiyo tracks in Georgia.

Source: Georgia Purchasing Group

Tender
Closed

The Scope of Services includes inspections , maintenance , repairs , and / or installations of plumbing systems , components , and fixtures as required by the City ’ s service requests . The contractor ( s ) shall provide all labor , equipment , and materials necessary to satisfactorily complete the project . This is an on - d

Status
Closed
Sector
Water Supply and Storage, Waste Processing and Treatment, Manufacturing (Industrial), Commercial, Residential
Location
Georgia, United States of America
Updated
3 Nov 2026
Source
Georgia Purchasing Group

ConstructChat

Ask ConstructChat about On - Call Plumbing Services

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “On - Call Plumbing Services” is a tender record in Taiyo, linked to the Water Supply and Storage sector. It is issued for works, goods, or services related to Georgia, United States of America.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

The Scope of Services includes inspections , maintenance , repairs , and / or installations of plumbing systems , components , and fixtures as required by the City ’ s service requests . The contractor ( s ) shall provide all labor , equipment , and materials necessary to satisfactorily complete the project . This is an on - demand contract . Annual quantities on the quote schedule are for price comparison and are estimates only . Quantities will vary depending upon need . Types of services shall include but not be limited to : • Water service lines and valves from the meters to the facilities • Domestic water piping throughout the facilities • Commercial and residential grade toilets , urinals , flush valves , sinks , showers , faucets , floor drains , and associated connections and piping • Sanitary waste piping within the facilities • Gas and electric water heaters • Electric water coolers • Outdoor and indoor drinking fountains • Sewer line repair , inspection , and unclogging • Kitchen equipment connections for gas and water lines • Miscellaneous and general plumbing items • Welding of piping and piping connections • Water features SERVICE CALLS ON A TIME AND MATERIAL BASIS • The Contractor ( s ) shall be available on a 24 hour / 7day per - week basis and shall respond to service requirements . The Contractor shall provide all of the transportation , equipment , labor , parts , and materials needed to complete necessary repairs due to service calls . • Compensation to the Contractor for service call responses will be based on the hourly labor rates provided in the quote for the Contract , the actual cost of parts plus a percentage markup indicated in the same quote ( but not to exceed 15 %), and a fixed trip charge when applicable . Hours shall be calculated daily from the time the Contractor ’ s personnel arrives at a service location until the person leaves the site . Travel time to and from the location will not be compensated , and travel time away from the service location will not be compensated on an hourly basis . However , one Service Call Charge of a fixed amount may be added to a service call to cover all travel time , including time away from the service site to pick up parts or materials . Overtime labor rates may be charged for time outside of the “ normal hours ” specified in the quote . Parts must be itemized and billed at actual cost plus the predetermined markup . The Contractor also agrees that it will provide documentation of costs for parts and materials upon request of the City . This is accomplished by attaching the itemized invoice . Subcontractor services when authorized by the City shall be billed at cost plus the same mark - up utilized for parts and materials . Sub - contractor costs must be documented . The contractor shall be trained and shall provide trained personnel to perform this type of service . • As noted above , the City will not pay the hourly labor rate for time to travel to and from the service site or away from the service location to pick up parts and / or materials . Instead , compensation may include one Service Call Charge per service call to cover any travel time . This amount will be a flat fee charged in lieu of hourly time . Example : Repair personnel shows up on job 9 : 00 AM checks out the problem and discovers that he needs to replace a part that he does not have on his service vehicle . He leaves the job site at 10 : 00 AM , picks up the part , and returns to the job site at 11 : 30 AM . He completes the repair at 12 : 30 PM . Billable costs at the hourly rate are from 9 : 00 – 10 : 00 and 11 : 30 – 12 : 30 , and there is one Service Call Charge . If an additional technician or technicians are required to perform the work , there is still only one Service Call Charge . • Regular hourly rates apply for services performed from 7 : 00 a . m . to 5 : 00 p . m ., Monday through Friday . Overtime hourly rates apply for services performed after hours ; weekends and holidays . Recognized holidays : New Year ’ s Day , Memorial Day , Independence Day , Labor Day , Thanksgiving Day , and Christmas Day . • The contractor will typically be expected to use one technician for a routine service call . If the contractor anticipates using more than one technician for the service , the contractor shall obtain prior approval from the City representative before committing to the use of additional staff . • Materials and parts supplied shall be new , of a quality conforming to current engineering and manufacturing standards , free of defects , and suitable for the intended use . The City reserves the right to provide materials , parts , and supplies for any authorized work item . Any material purchased by the contractor and not used shall be returned to the appropriate city representative . Materials required will be listed on the invoice when submitted and charged at the stated percentage of mark - up over the contractor ’ s cost . The contractor agrees to provide documentation of costs for parts and materials upon request .

Location

Country

United States of America (USA)

State

Georgia

Source

Source

Georgia Purchasing Group

URL

More Details

Record type

Tender

Sector

Water Supply and Storage, Waste Processing and Treatment, Manufacturing (Industrial), Commercial, Residential

Article published date

2026-04-29

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender