logo

Open tender contest - new school in Gryllefjord, turnkey contract

Contract notice · Norway · Last reported Mar 2026

Source: TED Europa

Tender
Contract Notice

The delivery is a turnkey contract for a new primary and secondary school in Gryllefjord in Senja municipality. The project includes a new primary and secondary school for 45 pupils, with special rooms, divided over three bases and one vestibular. The project also includes school administration, school library, gym hall and associated play areas for the school - as well as an option for a training

Status
Closed
Sector
Road, Education, Automotive
Location
Gryllefjord, Norway
Updated
3 Nov 2026
Source
TED Europa

ConstructChat

Ask ConstructChat about Open tender contest - new school in Gryllefjord, turnkey contract

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Open tender contest - new school in Gryllefjord, turnkey contract” is a tender record in Taiyo, linked to the Road sector. It is issued for works, goods, or services related to Gryllefjord, Norway.

Participants

Not available for this record.

Status

Original status

contract notice

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

The delivery is a turnkey contract for a new primary and secondary school in Gryllefjord in Senja municipality. The project includes a new primary and secondary school for 45 pupils, with special rooms, divided over three bases and one vestibular. The project also includes school administration, school library, gym hall and associated play areas for the school - as well as an option for a training pool. Traffic areas in the form of an access road, operational areas, car parks and a bus stop by (road) are also included. Ground work for the school, infrastructure, outside areas and traffic areas is carried out in a separate contract. Documents from this project are attached to the tender documentation. The engineering design documentation is based on a complete project with a school including training pool. The interface between the school and the training pool is shown on ARK and LARK drawings. The builder requests prices for: A new primary and secondary school with a gymnasium. The price must include engineering design services and changes in the substrate, as a result of the Training Basin not being included. Plan you shall then emanate. The turnkey contractor will be responsible for assessing and attending to the consequences, including deviations from the tender documentation. If an option for the training pool is not used, the energy central and main board room must be solved as additional areas outside the school gross. This system shall be included in the price. Option for training basins including ground works. The price must take into account that the engineering design in accordance with point 1 is not necessary. I.e. the Total of points 1 and 2 (option) is equivalent to the designed basis.

Original sector

Architectural, construction, engineering and inspection services, Architectural, construction, engineering and inspection services, Architectural, construction, engineering and inspection services, Construction work, Construction work, Architectural, construction, engineering and inspection services, Construction work, Construction work

Location

Country

Norway

City

Gryllefjord

Source

Source

TED Europa

URL

More Details

Record type

Tender

Sector

Road, Education, Automotive

Article published date

2026-03-27

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender