Opequon Creek , Berkeley County WV Blockage Removal
Sector: Waste Processing and Treatment • Location: West Virginia, United States of America
Source: West Virginia Purchasing Group
SCOPE OF WORK : The work will consist of supplying equipment with qualified operators and laborers with hand tools to remove identified blockages from streams , proper disposal of blockage materials , streambank work , and seeding and mulching of all disturbed areas of the work site ( s ) in Berkeley County , WV
- Status
- Closed
- Sector
- Waste Processing and Treatment, Biomass, Road
- Location
- West Virginia, United States of America
- Updated
- 3 Nov 2026
- Source
- West Virginia Purchasing Group
ConstructChat
Ask ConstructChat about Opequon Creek , Berkeley County WV Blockage Removal
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | SCOPE OF WORK : The work will consist of supplying equipment with qualified operators and laborers with hand tools to remove identified blockages from streams , proper disposal of blockage materials , streambank work , and seeding and mulching of all disturbed areas of the work site ( s ) in Berkeley County , WV . Removal of debris material from the stream and any required repairs to streambank due to damage from the blockage or during the removal of blockage will be completed directed by the Project Coordinator . Equipment and labor will be bid on a per hour basis based on Exhibit A – Pricing Page . All material must be removed and cannot be left within the floodplain of the streams or placed within another floodplain . Contractor will be responsible for identifying and securing Sediment / Cobble and Woody debris waste sites . The contractor will ensure that all material placed at the waste site conforms to Federal and State regulations and meets with the requirements of the landowner of the waste site and will be responsible for fixing any violations or issues that arise from their dumping at that site . The contractor will be responsible for all necessary permits for dumping at those sites . All other material will be considered Trash and needs to be removed separately and disposed of at a landfill . Trash is to be captured and not released downstream . Trash will be captured by means of netting set downstream as blockage is being pulled to prevent trash from being released beyond netting . The contractor will be responsible for all solid waste tipping fees . Soil Stabilization items , including but not limited to seed and mulch are required and listed on Exhibit A - Pricing Page . A STANDARD REQUIRED EQUIPMENT SET : The required equipment set for this contract shall be : 1 ) Two Hydraulic Excavators with Thumb and Operator 2 ) One On - Highway Dump Trucks and Operators 3 ) Two Laborers w / chain saws & hand tools ( and when needed as Flaggers ) flagging equipment Item Description Equipment Spec . ( i . e . make , model ) * Quantity Unit Unit Price Total 1 . Hydraulic Excavator # 1 with thumb , minimum of 89 H . P . Regular Hours 120 HR 0 . 0 2 . Hydraulic Excavator # 1 with thumb , minimum of 89 H . P . Over Time Hours 30 HR 0 . 0 3 . Hydraulic Excavator # 2 with thumb , minimum of 89 H . P . Regular Hours 120 HR 0 . 0 4 . Hydraulic Excavator # 2 with thumb , minimum of 89 H . P . Over Time Hours 30 HR 0 . 0 5 . Tandem Dump Truck , minimum of 250 H . P & 10 cy bed – Regular Hours 20 HR 0 . 0 6 . # 1 Laborer with Chain Saw , Hand Tools , & Flagging Equipment – Regular Hours N / A 120 HR 0 . 0 7 . # 1 Laborer with Chain Saw , Hand Tools , & Flagging Equipment – Over Time Hours N / A 30 HR 0 . 0 8 . # 2 Laborer with Chain Saw , Hand Tools , & Flagging Equipment – Regular Hours N / A 120 HR 0 . 0 |
Location
Country | United States of America (USA) |
State | West Virginia |
Source
Source | West Virginia Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Waste Processing and Treatment, Biomass, Road |
Article published date | 2026-05-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Waste Processing and Treatment tenders in United States of America
- Coatings for Wet Well and Manholes
- Sole Source for Wedeco UV BulbsBallets
- Chambers Creek Regional Wastewater Treatment Plant BNR Aeration Basin Airflow Meters
- Annual Construction Contract For Utility Replacement 2022A
- FY23 Sewer Rehabilitation
- Fire Station 32 ADA Restroom Improvements
- Foothills Trail East Puyallup McMillin Trailhead Improvements
- Pipeline Trail Phase 1 Project
