Orchard Ave ( E 1 / 2 Rd ) Safety & Connectivity Project Segments 2 & 3 Prelim Design
The scope, dates and status of this tender. A free account opens every field.
Source: Mesa County - Colorado
The intent of this phase of the project is to provide preliminary design and required NEPA investigation / clearances for approximately 8 , 250 linear feet of Orchard Avenue ( E 1 / 2 Road ). Segment 2 is located from the west side of 30 Road to Hoover Court and from the east end of Lewis Wash to Wa
- Status
- Closed
- Sector
- Water Supply and Storage, Road
- Location
- Colorado, United States of America
- Updated
- 3 Nov 2026
- Source
- Mesa County - Colorado
ConstructChat
Ask ConstructChat about Orchard Ave ( E 1 / 2 Rd ) Safety & Connectivity Project Segments 2 & 3 Prelim Design
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | The intent of this phase of the project is to provide preliminary design and required NEPA investigation / clearances for approximately 8 , 250 linear feet of Orchard Avenue ( E 1 / 2 Road ). Segment 2 is located from the west side of 30 Road to Hoover Court and from the east end of Lewis Wash to Warrior Way . Segment 3 is located from 29 1 / 2 Road to 30 Road including the structure at the Grand Valley Canal . See more |
Location
Country | United States of America (USA) |
State | Colorado |
Source
Source | Mesa County - Colorado |
URL |
More Details
Record type | Tender |
Sector | Water Supply and Storage, Road |
Article published date | 2026-05-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Water Supply and Storage tenders in United States of America
- RFP - Thurston County Lake Management Districts Submerged Aquatic Vegetation Control
- Coatings for Wet Well and Manholes
- Sole Source for Wedeco UV BulbsBallets
- Security Hardware Services
- Chambers Creek Regional Wastewater Treatment Plant BNR Aeration Basin Airflow Meters
- Se Dixie Highway County Road A1A Utility Relocation Project
- UNPAINTED SNOW FENCE AND DUNE GRASS NO II
- PreQualification of Bidders for Chaboya Improvements
