OVERFILL PROTECTION IN TANKS AT QATARENERGY REFINERY,MESAIEE
Sector: Oil and Gas • Location: Qatar
Source: QatarEnergy
The objective of this Contract is to utilize the services of a Contractor to undertake engineering, procurement, installation, testing, pre-commissioning, commissioning for the following Provision of High-high level and Low-Low level protection for fifteen (15) storage tanks within QatarEnergy Refinery Tank farm to avoid Overfilling of tanks and ensure pump protection respectively in line with SOR
- Status
- Prospective
- Sector
- Oil and Gas, Raw Materials
- Location
- Qatar
- Updated
- 3 Nov 2026
- Source
- QatarEnergy
ConstructChat
Ask ConstructChat about OVERFILL PROTECTION IN TANKS AT QATARENERGY REFINERY,MESAIEE
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | upcoming |
Taiyo status | Prospective |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | The objective of this Contract is to utilize the services of a Contractor to undertake engineering, procurement, installation, testing, pre-commissioning, commissioning for the following Provision of High-high level and Low-Low level protection for fifteen (15) storage tanks within QatarEnergy Refinery Tank farm to avoid Overfilling of tanks and ensure pump protection respectively in line with SOR-JUL2024-0004 based on Insurance Audit recommendation. New Level instruments to detect High High /Low Low level , new ESDVs at tank inlet lines to isolated inflow on High High level detection, provision to trip existing pumps on Tank Low Low detection shall be provided as part of the scope. Scope also includes modification of existing pump MCC module to accept ESD trip signals based on Tank Level detection. Scope also involves, Piping modification to accommodate new ESDVs & Level devices, provision of foundation for pipe supports, installation of new instrument air lines from nearest existing header for new ESDV valves. Supply of all Instrumentation materials including new level transmitters, new pneumatic isolation valve, Guided wire radar type, differential pressure type (DP) level transmitter, Emergency Shutdown (ESD) valves. The selection of make and type of Instruments and Instrumented Systems shall be made from the QatarEnergy Preferred Manufacturers List (PML) applicable to the project. Control system existing OEM (M/s Honeywell) shall be engaged to update DCS HMI Graphics page, Emergency shutdown (ESD) systems, relevant database, configure all alarms in DCS, verify requirement of new licenses, develop system logic diagrams and modify existing logic/program for signals. Electrical MCC existing OEM shall be engaged for performing MCC modification to included ESD trip contact provision. CONTRACTOR shall supply all necessary consumables, spare parts for pre-commissioning, commissioning and startup and two (02) years initial operating spare parts. |
Original sector | ASSET INTEGRITY (REFINING) |
Location
Country | Qatar |
Source
Source | QatarEnergy |
URL |
More Details
Record type | Tender |
Sector | Oil and Gas, Raw Materials |
Article published date | 2026-08-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Oil and Gas tenders in Qatar
- Closed Loop Wash Rack System
- Closed Loop Wash Rack System
- CYBERSECURITY PEOPLE PROGRAM
- Sale & Removal of Facilities Management, Operations & Maintenance, IT, Used Vehicle, Marine, Laboratory and Healthcare items.
- IMPLEMENTATION OF INSTRUMENT SORS AND MOCS AT QATARENERGY REFINERY, MESAIEED
- IMPLEMENTATION OF INSTRUMENT SORS AND MOCS AT QATARENERGY REFINERY, MESAIEED
- IMPLEMENTATION OF INSTRUMENT SORS AND MOCS AT QATARENERGY REFINERY, MESAIEED
- IMPLEMENTATION OF INSTRUMENT SORS AND MOCS AT QATARENERGY REFINERY, MESAIEED
