Oxford Street - Permanent scheme engineering services
Complete · United Kingdom
Source: Find a Tender Service (UK)
A multi-disciplinary engineer team is sought to support the design of the permanent scheme of the Oxford Street Transformation Project (OSTP). During the project period covering RIBA stages 2 and 3, the engineer will be required to work alongside the design team (East) to develop a concept and coordinated design, after which a period of coordination with TfL and then review of RIBA 4 detailed desi
- Status
- Closed
- Sector
- Road
- Location
- United Kingdom
- Updated
- 3 Nov 2026
- Source
- Find a Tender Service (UK)
ConstructChat
Ask ConstructChat about Oxford Street - Permanent scheme engineering services
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | complete |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | A multi-disciplinary engineer team is sought to support the design of the permanent scheme of the Oxford Street Transformation Project (OSTP). During the project period covering RIBA stages 2 and 3, the engineer will be required to work alongside the design team (East) to develop a concept and coordinated design, after which a period of coordination with TfL and then review of RIBA 4 detailed design (by others) will be required. |
Location
Country | United Kingdom (UK) |
Source
Source | Find a Tender Service (UK) |
URL |
More Details
Record type | Tender |
Sector | Road |
Article published date | 2026-10-20 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
