P100 -- Atlanta Office Furniture Removal and Disposal - Decommissioning
One of 10,000+ tenders Taiyo tracks in Georgia.
Source: Georgia Purchasing Group
Amendment Important Reminders and Q & A The deadline for quote packages remains 12pm MST / 2pm EST on Friday , December 19th , 2025 . All quote packages must be received by the deadline . Vendors are STRONGLY encouraged to read the full original solicitation regarding the required information and documentation that
- Status
- Closed
- Sector
- Warehouse, Government, Telecommunications, Metal, Power Generation (CCGT), Car parking, Commercial, Automotive, Residential
- Location
- Georgia, United States of America
- Updated
- 3 Nov 2026
- Source
- Georgia Purchasing Group
ConstructChat
Ask ConstructChat about P100 -- Atlanta Office Furniture Removal and Disposal - Decommissioning
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | Amendment Important Reminders and Q & A The deadline for quote packages remains 12pm MST / 2pm EST on Friday , December 19th , 2025 . All quote packages must be received by the deadline . Vendors are STRONGLY encouraged to read the full original solicitation regarding the required information and documentation that must be included in their quote package . Failure to provide ALL information requested may result in a vendor not being considered for further review and / or award . Due to this requirement being set - aside for SDVOSB specifically , Limitations on Subcontracting does apply . Vendors will need to read and complete VAAR 852 . 219 - 75 regarding their ability to meet subcontracting limitations as part of the mandatory documents for their quote package . The following questions were asked prior to the deadline for questions . Interested vendors are strongly encouraged to review all questions . A follow up email may be sent to stephanie . cahill @ va . gov for clarification if the questions below are not satisfactorily answered . Do the cabinets that are bolted to the wall get removed ? Yes If the Cabinets are required to be removed , who is responsible for patching and painting ? The contractor is responsible for the safe removal of all wall - mounted items without incurring any additional damages to the existing wall surfaces . The contractor is not responsible for the repair of damages incurred because of mounting hardware used during installation . The contractor is responsible to repair , at contractor expense , any damages incurred because of contractor related removal efforts .  Does the wall art get removed ? Yes Do appliances get removed ? No The raised flooring in the mail room , does this get removed ? No Can we use both first floor front and back exits to remove furniture ? Yes , both doors can be used . Note , it is the contractor s responsibility to ensure that the main entrance flooring is not damaged in any way . Any damage as a result of contractor action with be at the contractor s expense to repair or replace .   Do we have full access to the parking area for our containers ? The contractor provided dumpsters can be placed along the front parking lot ( west side of the building ). The same parking lot continues to wrap around the building to the southwest and this space is provided for dumpster parking if needed . What is the process if the elevator or elevators go down ? Contractor will need to use the fire stairwells . Is this a Certified Payroll project using Davis - Bacon Act ? This project is not categorized as a construction project . Therefore , we do not anticipate Davis - Bacon Act would apply . The Government does not anticipate requiring the prime vendor to submit any certified payroll information . However , Limitations on Subcontracting ( LOS ) does apply to this requirement since it is set - aside for SDVOSBs . Vendors must review the LOS document very carefully and complete it to include in their quote package . Is it acceptable for proposals to submit a single consolidated proposal with four ( 4 ) sections corresponding to the quote requirements and Evaluation Factors ?  Yes , vendors are welcome to submit all information in the format they feel is best . However , vendors must ensure all requested information and documentation is easy to identify when the Government is reviewing . Can you please clarify the timeline requirements regarding Volume 1 and IV referencing a Project Service Timeline ? Each vendor must provide an overview of their plan to complete the work on the project that must occur within 1 / 26 2 / 6 / 2026 . The information can be broken down into what work is planned to be accomplished each day of the project . We understand things may change after award during post - award discussions but we do need some form of documentation that the vendor has a tentative plan in place to successfully complete this project within the allotted time . Can you clarify how technical capability and quality of services offered will be evaluated ?  Will there be a rating assigned to Factor 1 ? No ratings will be assigned . However , vendors are encouraged to provide as much information as possible to support their claim that they are capable of meeting the project deadlines and all requirements included . Vendors might provide information on their plans for the disposal ( how big the dumpster is , how often it will be emptied , etc .) as well as how many employees will be onsite each day , and other logistics that should be planned by the vendor in order for them to be able to generate an accurate quote for this project . Can you please confirm that all furniture must be disposed of through recycle and transfer stations . No resale , recycling , or donations allowed ? All government property must be destroyed and disposed of properly . The contractor is prohibited from reselling , donating , or utilizing government property without the expressed , written , consent of the Contracting Officer Representative ( COR ) prior to any such action . Destruction means destroying an item in a manner in such a way that the item can no longer be utilized for its original , intended , purpose . Recycling : Recycling is not a requirement . It is the contractor decision if recycling is in their best interests . Can you please confirm that all built - in cabinetries must be removed unless there is a sink ? Yes . This is correct . We anticipate that the government would benefit from extending contractor work hours Monday through Friday and possibly adding Saturdays as a working day . Is this within the acceptable capability for government representative ( s ) accommodation and oversight ? Vendors should plan to work within the hours and days indicated in the solicitation . However , some flexibility might be available depending on numerous factors . This can be addressed with the awardee during the post - award discussions . Would you please confirm that all building occupants will have vacated the building and removed all property not specified in the PWS ? In other words , will the contractor have exclusive use of all areas of the building necessary to perform the removal and disposal tasks ? Only the VA POC and contractor provided personnel should be in the facility during the period of performance for this action . However , the Government cannot guarantee 100 % vacancy as there are numerous departments working on transferring over to the new facility . Since this is a permanent transfer to a new facility , any items leftover once this project starts is likely to need to be removed and disposed of by the vendor . However , a VA POC will be onsite at the facility during the project , if there are any IT - related items found , the VA POC should be notified immediately since the VA will be removing them . Can you please clarify the deadline ? Is the reference to MST correct ? Yes , the deadline is 12pm MST or 2pm EST on Friday , December 19th , 2025 . How many people are allowed onsite at one time ? Contractor shall provide , operate , manage , and maintain sufficient personnel based on workload to accomplish all assigned tasks for this requirement . The Contractor shall ensure that contractor provided employees have the technical capability to disassemble , carry , remove , and dispose of all types of furniture .  Total number of employees needed to perform the work is a contractor determination . During yesterday s walk - through with Lindsey Peace , we were unable to view the basement or its equipment . Since these areas were not included in the Combined Synopsis / Solicitation , their condition remains unknown to us . Aside from the items listed in the provided Atlanta Excel sheet , we lack visibility on the basement assets . Is it possible to schedule a return trip to view the basement ? Unfortunately , this project needs to be completed on 2 / 6 / 2026 and there are several steps still needed in order to get this awarded . As a result , we are unable to offer another site visit . Vendors should reference the information provided and generate their quote to the best of their ability based on the information they have . Are cubicle systems required to be fully disassembled , or may they be removed in sections ? There are no specifications on this the vendor may determine the best method with the final result being the furniture is completely removed from the facility . The vendor remains responsible to safely disconnect all electric whips prior to disassembly . Are there any items excluded from removal ( e . g ., IT equipment , wall - mounted fixtures , safes )? This project should be the last step for final , official move - out of the facility . Therefore , there should not be anything other than the furniture in the building that needed to be removed . The station POC will let the vendor know during the project if anything still needs to be removed such as IT equipment which would be removed by the VA s IT team . Will furniture be grouped / staged prior to removal , or is removal required from individual offices ? There will be no staging or grouping of furniture . The vendor will be responsible for going through each floor and each office / area to ensure the furniture is removed and disposed of . Are there specific disposal or recycling requirements ( e . g ., metal recycling , landfill restrictions )? Recycling is encouraged but not required . Recycling of the metals is to the vendor s benefit , but recycling is not mandatory . Is documentation of disposal / recycling required with the invoice ? No . Vendors may choose to recycle but the Government will not require documentation . Proof will be the absence of the furniture from the site . The station POC will be able to observe this work being done . Are there restrictions on disposal facilities ( VA - approved or local only )? No restrictions that we are aware of . Vendors should use their best judgement to complete this project responsibly .  Is removal of fasteners , anchors , floor plates , or adhesive residue required ? Anything associated with the furniture such as fasteners and anchors should be removed along with the furniture itself . The goal is to leave facility as empty as possible for the owner of the building to be able to easily prepare the space for the next tenant . Are there height , weight , or equipment restrictions for elevators or hallways ? Height of the door openings were provided in the solicitation Weight : 1200 pounds max Equipment restrictions : Nothing should be loaded that would cause damage to the elevator . Hallways should be prepped to allow safe movement of furniture and equipment without damage to the area . PWS 5 . 0 - Risk Control and Safety Measures outlines the requirements for protecting the facility - specifically the main entrance flooring . Will the Government provide access badges , or must the contractor escort all personnel ? A VA employee will be onsite for each day of the project and would be the escort for all personnel onsite . Are there parking restrictions for box trucks or dumpsters ? The employees at this location would have moved to the new facility already . As a result , there should be no issues with parking during this project . Are background checks or PIV credentials required for contractor personnel ? There is no patient , staff , or other information located on site . Therefore , security checks are encouraged by the Contractor but will not be inspected by the Government . A Project Manager ( PM ) shall be onsite for the duration of each day for the project and shall be responsible for their team s conduct and progress . If so , what is the lead time to obtain approvals ? N / a Are there any restricted areas that require advance coordination ? None . The building has been emptied of employees and sensitive information . The PM should communicate with the VA POC to ensure the area they will be working in is fully opened . Is the completion date of Feb 6 , 2026 firm , or is there any flexibility ? Will the Government allow phased completion by floor or area ? Per the solicitation all work MUST be completed no later than 2 / 6 / 2026 . The Contractor may finish the project earlier but shall not exceed 2 / 6 . The Government has not specified the order the work must be done in . The vendor should provide an estimated timeline overview as part of their quote package but one way is not preferred over another . Will VA staff be available to unlock rooms and supervise access during removal ? Per the solicitation VA POC will be onsite each day of the project to facilitate access to the building although the PM will be responsible for overall project supervision . What constitutes facility damage versus normal wear ? Facility damage is significant and / or noticeable damage / alteration due to negligence , carelessness , misuse , or avoidable accidents ( large holes , deep stains , broken fixtures , etc .). Both the VA POC and the Contractor are each encouraged to take pictures of the areas prior to starting work in order to provide documentation at a later date if needed . Is the contractor responsible for minor wall or floor repairs caused by removal ? Unavoidable damage must be communicated to the VA POC in advance and should receive confirmation to proceed before starting the work that would cause the minor damage / alteration . Are there specific insurance limits required beyond standard VA contracting requirements ? No specifications on insurance . The Contractor shall be responsible for repairing any damage caused that was not approved by the VA POC . The Contractor shall plan and prepare to pay for the entire cost of the unapproved damage / alteration . Where exactly would you want trucks to stage / park , and are there any curb / traffic restrictions ? Contractor parking and staging will be allowed in the front and east side of the facility What dumpster types / sizes are allowed on - site and where can dumpsters be placed ? Sizes are at the contractor s discretion . Dumpsters will also be allowed in the front and eastern side of the facility . Is there any recycling requirements ( metal , e - waste , shredding , etc .) or city / VA disposal restrictions we must follow ? Recycling requirements : Recycling is not required but encouraged . Disposal restrictions : Use of local , approved , landfills is requested . What is the inspection / acceptance process by floor / zone , and what constitutes complete ( e . g ., vacuuming , debris removal , adhesive residue )? Acceptance will occur when conditions stated in the contract are met . Acceptance is based on all furnishings , trash , debris are removed and all carpeted areas vacuumed . All hard surface flooring has been swept as well . If there is damage , what is the reporting / repair process and timeline expectation ? The contractor onsite PM and the Contracting Officer Representative ( COR ) will be working closely throughout the project to ensure damages do not occur . If damage do occur because of contractor actions , the contractor PM will notify the COR immediately regarding the damages and the contractor s plan for repairs . All repairs must be complete before the government pays the final contractor invoice .   Would the only personnel in the building be the Contract team and the VA Rep ? Currently , only the Contracting Officer Representative ( COR ) and contractor personnel are expected to be in the facility at time of execution . Are stairs able to be used in addition to the Elevators ? Yes Are there rooms / offices that we would NOT be clearing out ? And if so , would we be able to get final guidance / clarification on Day 1 before starting ? All offices will be cleared of all furnishings . The Contracting Officer Representative ( COR ) will be onsite throughout to respond to any questions that arise during the effort .  How do we need to remove the wires from the cubicles , tables , etc .? Are we able to cut them or do we need to remove them from the cubicles intact so they can be reused ? Would they like them professionally capped ? The cubicle whips , or power cords , are generally hard wired into wall mounted electrical boxes . For removal , the whips will be removed by disconnecting the cords from the wall boxes and then replacing the covers on the electrical boxes . Once disconnected , the power whips will be disposed of along with the rest of the items in this requirement . Same applies to all data connections as well . Would they like the blue recycling bins in the break rooms to be removed ? Yes To confirm , the hours of operation are 8am - 7pm and no one will be onsite during this time so we can move items out of the space during the day , correct ? Per the Performance Work Statement , section 2 . 1 : Work will be scheduled primarily during normal business hours ( 6 : 30 am to 5 : 00 pm EST ) Monday through Friday . All contractor requests for extended working hours will be considered on a case - by - case basis .    During the period of performance , only the Contracting Officer Representative ( COR ) and contractor provided personnel are projected to be on site during the execution of this effort . Can we drop dumpsters in the parking lot , or is there a dedicated space for them ? The contractor provided dumpsters can be placed along the front parking lot ( west side of the building ). The same parking lot continues to wrap around the building to the southwest and this space is provided for dumpster parking if needed .  How in depth would they like the building cleaned ? It mentions a sweep , but I would like more clarification there . As stated in the Performance Work Statement , section 4 . 1 : Contractor cleaning , vacuuming , removal of all trash , residue , furniture waste and any other debris remaining in the vacant areas . This means vacuuming all carpeted areas , sweeping all hard surface , and removal and disposal of all trash , residue , debris , and furniture waste materials .  During the site visit , whiteboards were observed on the first floor that appear to be mounted or built into the walls . Please confirm whether these whiteboards are within the scope of removal . Additionally , please advise if there are any items requiring removal that are not currently reflected on the Excel inventory spreadsheet .   Yes , all wall mounted white boards throughout the facility are to be removed and discarded without incurring any additional damages to the walls themselves . All wall art throughout the facility is to be removed in the same manner as well . The contractor is not required to patch , fill or repair wall openings incurred during the wall board / art installation . Other items not currently reflected in the provided inventory spreadsheet : We don t know of any items not listed in the spread sheet , but it should be noted that we will continue to make the facilities contents available to other federal , state , and local agencies who wish to reuse these items prior to the start date of this action . This will result in a reduction in the total number of items requiring removal by the contractor .     Please clarify what documentation will be required to verify proper disposal or recycling ( e . g ., landfill receipts , weight tickets , recycling certificates , photographs , or affidavits ). There are no such requirements listed . Are there any items that require destruction rather than standard disposal or recycling ? All government property must be destroyed and disposed of properly . The contractor is prohibited from reselling , donating , or utilizing government property without the expressed , written , consent of the VA POC prior to any such action . Destruction means destroying an item in a manner in such a way that the item can no longer be utilized for its original , intended , purpose . Recycling : Recycling is not a requirement . It is the contractor decision if recycling is in their best interests . How do we need to remove the wires from the cubicles , tables , etc .? Are we able to cut them or do we need to remove them from the cubicles intact so they can be reused ? Would they like them professionally capped ? The cubicle whips , or power cords , are generally hard wired into wall mounted electrical boxes . For removal , the whips will be removed by disconnecting the cords from the wall boxes and then replacing the covers on the electrical boxes . Once disconnected , the power whips will be disposed of along with the rest of the items in this requirement . Same applies to all data connections as well . Would they like the blue recycling bins in the break rooms to be removed ? Yes To confirm , the hours of operation are 8am - 7pm and no one will be onsite during this time so we can move items out of the space during the day , correct ? Work will be scheduled primarily during normal business hours ( 0700 - 1800 EST ) Monday through Friday . All contractor requests for extended working hours will be considered on a case - by - case basis . Can we drop dumpsters in the parking lot , or is there a dedicated space for them ? The contractor provided dumpsters can be placed along the front parking lot ( west side of the building ). The same parking lot continues to wrap around the building to the southwest and this space is provided for dumpster parking if needed .  How in depth would they like the building cleaned ? It mentions a sweep , but I would like more clarification there . Contractor cleaning , vacuuming , removal of all trash , residue , furniture waste and any other debris remaining in the vacant areas . This means vacuuming all carpeted areas , sweeping all hard surface , and removal and disposal of all trash , residue , debris , and furniture waste materials .  Will any cabinetry that does not have a sink be thrown out ? All government property must be destroyed and disposed of properly . The contractor is prohibited from reselling , donating , or utilizing government property without the expressed , written , consent of the Contracting Officer Representative ( COR ) prior to any such action . Destruction means destroying an item in a manner in such a way that the item can no longer be utilized for its original , intended , purpose . For the cubicles , do we disconnect from the main power source or disassemble each individual power source from each cubicle ? There are a lot of cubicles so we are just seeking clarification . The cubicle whips , or power cords , are generally hard wired into wall mounted electrical boxes . For removal , the whips will be removed by disconnecting the cords from the wall boxes and then replacing the covers on the electrical boxes . Once disconnected , the power whips will be disposed of along with the rest of the items in this requirement . Same applies to all data connections as well Can we give the chairs and desks away ? We don ' t want to sell them just give them away . All government property must be destroyed and disposed of properly . The contractor is prohibited from reselling , donating , or utilizing government property without the expressed , written , consent of the VA POC prior to any such action . Destruction means destroying an item in a manner in such a way that the item can no longer be utilized for its original , intended , purpose . Will the floors be vacated during the 2 weeks of removal ? Only the VA POC and contractor provided personnel will be in the facility during the period of performance for this action .  Are there any fire - resistant cabinets in place ? None that we are aware of . If a fire - resistant cabinet is discovered during the period of performance , the cabinet will be handled the same manner as any other furnishing in the facility . Please confirm if cubicle whips are to be disconnected from furniture and left in place , or will they need to be removed from the building connection ? The contractor is responsible for properly disconnecting and disposing of all electrical power cords , cubicle whips , and any other power cables that provide electrical power to all furnishings will be removed . Is after - hours or weekend work allowed if needed ? Work will be scheduled primarily during normal business hours ( 0700 - 1800 EST ) Monday through Friday . All contractor requests for extended working hours will be considered on a case - by - case basis . Will the building be occupied during performance ? Only the VA POC and contractor provided personnel will be in the facility during the period of performance for this action . What are the badge , escort , and daily check - in requirements ? None , The VA POC will be onsite daily to allow access . The contractor is responsible for maintaining accountability of their personnel . Where are the approved truck staging and parking areas ( no loading dock )? The contractor provided dumpsters can be placed along the front parking lot ( west side of the building ). The same parking lot continues to wrap around the building to the southwest and this space is provided for dumpster parking if needed .  Who is responsible for wall - mounted item removal and wall repairs ? The contractor is responsible for the safe removal of all wall - mounted items without incurring any additional damages to the existing wall surfaces . The contractor is not responsible for the repair of damages incurred because of mounting hardware used during installation . The contractor is responsible to repair , at contractor expense , any damages incurred because of contractor related removal efforts .  After cabinet removal , is the contractor responsible for drywall , painting , or floor repairs , or will the Government handle this ? The contractor is not responsible for the repair of damages incurred because of mounting hardware used during installation . The contractor is responsible to repair , at contractor expense , any damages incurred because of contractor related removal efforts .  Does the mailroom flooring need to be removed ?               No Are electronics / cabling included in the scope ? I m not sure of any other electronics cabling that is referred , but per the performance Work statement The contractor is responsible for properly disconnecting and disposing of all electrical power cords , cubicle whips , data cabling , and any other power cables that provide electrical power to all furnishings will be removed .             Will file cabinets be emptied prior to removal ? Yes Are any safes or unusually heavy items included ? Safes : No Unusually heavy items : All items are already listed in the provided furnishing spreadsheet . What is the distance to loading areas for hauling ? The contractor provided dumpsters can be placed along the front parking lot ( west side of the building ). The same parking lot continues to wrap around the building to the southwest and this space is provided for dumpster parking if needed .  Please confirm dumpster locations , size limits , and swap schedule . The contractor provided dumpsters can be placed along the front parking lot ( west side of the building ). The same parking lot continues to wrap around the building to the southwest and this space is provided for dumpster parking if needed .  Size limits : None . Swap schedule : Contractor discretion Can the Government confirm no hazardous materials remain ? There are no hazardous materials in the facility . If any hazardous materials are found during the execution of this effort , the contractor is not responsible for the proper removal and disposal of such materials . What disposal documentation is required ? There are no such requirements listed in the Performance Work Statement . What are the daily cleaning requirements ? There are no daily cleaning requirements listed in the Performance Work Statement . As stated in the Performance Work Statement , Contractor cleaning , vacuuming , removal of all trash , residue , furniture waste and any other debris remaining in the vacant areas . This means vacuuming all carpeted areas , sweeping all hard surface , and removal and disposal of all trash , residue , debris , and furniture waste materials .  This requirement is due at time of effort completion .            How should pre - existing damage be documented ? As stated in the solicitation , it is recommended that the contractor take photos of the facility to verify existing facility damages . |
Location
Country | United States of America (USA) |
State | Georgia |
Source
Source | Georgia Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Warehouse, Government, Telecommunications, Metal, Power Generation (CCGT), Car parking, Commercial, Automotive, Residential |
Article published date | 2026-04-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Warehouse tenders in United States of America
- City Distribution Division Campus at 2000 Marin [Evaluation ...
- RFQ for Selected Wastewater Pump Stations
- San Francisco Westside Recycled Water Irrigation System Retr...
- Warehouse Office Suite Renovation, 1990 Newcomb Avenue, San ...
- SFPUC Upcoming Contracting Opportunity - Folsom Area Stormwa...
- As-Needed Spot Sewer Replacement No. 43 [BID TABULATION]
- Request/Notice for Qualifications for Biosolids Digester Fac...
- As-Needed Spot Sewer Replacement No. 40 [BID TABULATION]
