Pa Dep Certified Drinking Water Operator
One of 10,000+ tenders Taiyo tracks in Pennsylvania.
Source: Pennsylvania Purchasing Group
The operator shall determine the optimum range of operational controls and disinfectant dosage necessary to maintain adequate chlorine residual , produce the highest quality of potable water and maintain satisfactory water pressure throughout the distribution system . During each site visit , the water supply system
- Status
- Closed
- Sector
- Hydro, Chemical (Industrial), Water Supply and Storage, Manufacturing (Industrial)
- Location
- Pennsylvania, United States of America
- Updated
- 3 Nov 2026
- Source
- Pennsylvania Purchasing Group
ConstructChat
Ask ConstructChat about Pa Dep Certified Drinking Water Operator
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | The operator shall determine the optimum range of operational controls and disinfectant dosage necessary to maintain adequate chlorine residual , produce the highest quality of potable water and maintain satisfactory water pressure throughout the distribution system . During each site visit , the water supply system shall be monitored and evaluated , and suitable operational adjustments implemented accordingly to optimize system performance . Routine operation and maintenance shall include , but not be limited to : i . Performing routine maintenance and equipment inspections ; ii . Checking for proper operation of the submersible well pump , softener , reverse osmosis system and chemical feed pumps ; iii . Checking levels in the chemical feed tanks , softener brine tanks and preparing disinfection solution as required ; iv . Maintaining no less than 0 . 2 mg / L chlorine residual throughout the distribution system . When a sampling point has been shown to have a free chlorine residual of less than 0 . 2 mg / L , the Bidders shall take all necessary corrective action to increase the chlorine residual ; v . Adjusting disinfectant solution strength and / or chemical feed rates for maintaining adequate chlorine residual ; vi . Adjusting permeate rate as required ; vii . Replacement of the inline sediment filter monthly ; viii . Replacement of the reverse osmosis filter membranes yearly ix . Replace acid neutralizer media every 6 months x . Perform O & M maintenance on the softener and reverse osmosis system in accordance with manufacturer recommendations . xi . Checking for air or water leaks in the system , verifying proper operating water levels in the hydro pneumatic tank and ensuring adequate system pressure . All records of equipment replacement or repairs shall be maintained in a daily log kept on - site in a location accessible for a 24 - hour inspection by representatives of PennDOT and / or the PADEP . The Bidders shall prepare and implement a preventative maintenance program for maintaining and preserving facility and system equipment and will be liable for repairs resulting from the lack of effective maintenance . |
Location
Country | United States of America (USA) |
State | Pennsylvania |
Source
Source | Pennsylvania Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Hydro, Chemical (Industrial), Water Supply and Storage, Manufacturing (Industrial) |
Article published date | 2026-05-09 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Hydro tenders in United States of America
- Landscaping (C-27 License), San Francisco, San Mateo, Santa ...
- Bay Corridor Transmission & Distribution - Phase 2 (2019) S...
- College Hill Reservoir Outlet Structure And Pipeline
- Bay Corridor Transmission and Distribution - Phase 3 (2019)
- Regional Groundwater Storage and Recovery
- Fillmore and Haight Street Intersection AWSS, Pavement, and ...
- REJECTED: Southeast Water Pollution Control Plant Power Feed...
- Turner Dam Spillway and Pond F3 East Erosion Repair
