Pad-Mounted Transformer

Sector: Commercial • Location: Fort Buchanan, Puerto Rico

Source: SAM.gov

Tender
Combined Synopsis/Solicitation

Provide one Pad Mounted Transformer 750 kVA, 13.2 kV /208Y/120 V. Salient Characteristics: Furnish one (1) pad mounted, dead front, radial transformer, rated: ? Capacity: 750 kVA ? Phases: 3 ? Primary Voltage: 13,200 V (15 kV class) ?Secondary Voltage: 208Y/120 V ? Frequency: 60 Hz ? Phase: Three phase ? Cooling :ONAN ? Fluid: Mineral oil 2. Mandatory Physical Dimensions: The following dimensions

Status
Prospective
Sector
Commercial, Aerospace & Defense, Water Supply and Storage, Steel, Government, Fertilizers, Oil and Gas, Power Generation (CCGT), Manufacturing (Industrial), Residential
Location
Puerto Rico
Updated
3 Nov 2026
Source
SAM.gov

ConstructChat

Ask ConstructChat about Pad-Mounted Transformer

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Pad-Mounted Transformer” is a tender record in Taiyo, linked to the Commercial sector. It is issued for works, goods, or services related to Fort Buchanan, Puerto Rico.

Participants

Not available for this record.

Status

Original status

combined synopsis/solicitation

Taiyo status

Prospective

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

Provide one Pad Mounted Transformer 750 kVA, 13.2 kV /208Y/120 V. Salient Characteristics: Furnish one (1) pad mounted, dead front, radial transformer, rated: ? Capacity: 750 kVA ? Phases: 3 ? Primary Voltage: 13,200 V (15 kV class) ?Secondary Voltage: 208Y/120 V ? Frequency: 60 Hz ? Phase: Three phase ? Cooling :ONAN ? Fluid: Mineral oil 2. Mandatory Physical Dimensions: The following dimensions are non negotiable: ? Height: 63?? inches (up to 64?? inches) ? Width: 65 inches ? Depth: May varies (existing is 41 inches) The Contractor shall confirm with proposal the manufacturing dimensions, either in writing or by a shop drawing, for government approval. 3. Mechanical and Construction Requirements: The transformer shall include: ?Stainless steel tank, cabinet and hardware (304) ? Dead front construction ? Pentahead security hardware ? ANSI 61 Grey color to match with existing enclosure ? Welded tank construction, sealed and pressure tested ? 1-inch Oil drain valve located on the primary side with 3/8-inch water sampler (required due to secondary side cable congestion) ? Arc-flash and safety labeling ? Lifting lugs and jacking pads ? Nameplate per ANSI C57.12.00 4.Electrical Requirements: ? Primary bushings: (6) 200 A load break wells with inserts for (3)LV and (3) 10KV arresters ? Secondary bushings: NEMA spade w/ supports terminals 10holes (3) LV and (1) neutral per ANSI ? Configuration: Radial Feed ? Impedance: Standard ANSI values for 750 kVA ? Taps: ?2 x 2.5% (standard 5 position no load tap changer) 5.Protection and Monitoring: The transformer shall include: ? Bayonet fuse with isolation link? Current limiting fuses ? Load break switch (2 position minimum) ? Nitrogen pressure gauge, test port and blanket ? Temperature gauge ? Pressure vacuum gauge ? Liquid level indicator ? Schrader valve Note: All gauges must be visible. 6. Compliance Requirements: The transformer must comply with: ? ANSI/IEEE C57.12 series ? DOE 2016 efficiency standards ? National Electrical Safety Code (NESC) ? National Electrical Code (NEC /NFPA 70) ? UFGS 26 12 19 ? Pad Mounted, Liquid Filled, Medium Voltage Transformers ?American Buy Act ? PCB-free oil certification ? UL Listed 002. Provide Factory routine test Reports Results and documentation as minimum: ? Insulation resistance test ? Winding resistance test ? Turns ratio (TTR) ?Polarity and phase-relation test ? No-load and load-loss test ? Dielectric test ? Excitation test ?Impedance test ? Applied and Induced potential tests ? Leak Test ? Oil quality test (dielectric strength, moisture, interfacial tension) ? Certified As-built drawings ? Certified test report signed by manufacturer ? Installation and OM manuals ? Warranty documentation (minimum 1 year) ? Destination to the federal facility Fort Buchanan, Puerto Rico00934 ? ECD: 40 weeks ? Unit must arrive fully assembled and ready for installation ?Packing slip must include contract number, PO number, and serial number? Minimum 1 year manufacturer warranty covering defects in equipment.

Original sector

Not Identified

Location

Country

Puerto Rico

Source

Source

SAM.gov

URL

More Details

Record type

Tender

Sector

Commercial, Aerospace & Defense, Water Supply and Storage, Steel, Government, Fertilizers, Oil and Gas, Power Generation (CCGT), Manufacturing (Industrial), Residential

Article published date

2026-07-23

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender