logo

Park Improvements Markwoodlands Park

Bids closed Apr 2026 · Illinois · Last reported Apr 2026

Source: Illinois Purchasing Group

Tender
Closed

PART 1 : GENERAL 1 . 01 DESCRIPTION A . These general site work requirements apply to all site work operations . Refer to Division 2 specification sections for specific general , product , and execution requirements . 1 . 02 QUALITY ASSURANCE A . Comply with all applicable local , state , and federal requirements regardin

Status
Closed
Sector
Road, Power Transmission, Power Generation (CCGT), Car parking, Commercial, Automotive
Location
Illinois, United States of America
Updated
3 Nov 2026
Source
Illinois Purchasing Group

ConstructChat

Ask ConstructChat about Park Improvements Markwoodlands Park

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Park Improvements Markwoodlands Park” is a tender record in Taiyo, linked to the Road sector. It is issued for works, goods, or services related to Illinois, United States of America.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

PART 1 : GENERAL 1 . 01 DESCRIPTION A . These general site work requirements apply to all site work operations . Refer to Division 2 specification sections for specific general , product , and execution requirements . 1 . 02 QUALITY ASSURANCE A . Comply with all applicable local , state , and federal requirements regarding materials , methods of work , and disposal of excess and waste materials . B . Obtain and pay for all required inspections , permits , and fees . Provide notices required by governmental authorities . 1 . 03 PROJECT CONDITIONS A . Locate and identify existing underground and overhead services and utilities within contract limit work areas . Provide adequate means of protection of utilities and services designated to remain . Repair utilities damaged during site work operations at Contractor ’ s expense . B . Arrange for disconnection , disconnect and seal or cap all utilities and services designated to be removed before start of site work operations . Perform all work in accordance with the requirements of the applicable utility company or agency involved . C . When uncharted or incorrectly charted underground piping or other utilities and services are encountered during site work operations , notify the applicable utility company immediately to obtain procedure directions . Cooperate with the applicable utility company in maintaining active services in operations . D . Locate , protect , and maintain bench marks , monuments , control points and project engineering reference points . Re - establish disturbed or destroyed items at Contractor ’ s expense . E . Perform site work operations and the removal of debris and waste materials to assure minimum interference with streets , walks , and other adjacent facilities . F . Obtain governing authorities written permission when required to close or obstruct street , walks and adjacent facilities . Provide alternate routes around closed or obstructed traffic ways when required by governing authorities . G . Control dust caused by the work . Dampen surfaces as required . Comply with pollution control regulations of governing authorities . H . Protect existing buildings , paving , and other services or facilities on site and adjacent to the site from damage caused by site work operations . Cost of repair and restoration of damaged items at Contractor ’ s expense . I . Protect and maintain street lights , utility poles and services , traffic signal control boxes , curb boxes , valves and other services , except items designated for removal . Remove or coordinate the removal of traffic signs , parking meters and postal mail boxes with the applicable governmental agency . Provide for temporary relocation when required to maintain facilities and services in operation during construction work . J . The Owner will occupy the premises and adjacent facilities during the entire period of construction . Perform site work operations to minimize conflicts and to facilitate Owner ’ s use of the premises and conduct of his normal operations . K . The Contractor shall stage the work in order to provide safe access to the building for all users , including those in mobility devices .

Location

Country

United States of America (USA)

State

Illinois

Source

Source

Illinois Purchasing Group

URL

More Details

Record type

Tender

Sector

Road, Power Transmission, Power Generation (CCGT), Car parking, Commercial, Automotive

Article published date

2026-04-29

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender