Park Improvements Markwoodlands Park
Bids closed Apr 2026 · Illinois · Last reported Apr 2026
Source: Illinois Purchasing Group
PART 1 : GENERAL 1 . 01 DESCRIPTION A . These general site work requirements apply to all site work operations . Refer to Division 2 specification sections for specific general , product , and execution requirements . 1 . 02 QUALITY ASSURANCE A . Comply with all applicable local , state , and federal requirements regardin
- Status
- Closed
- Sector
- Road, Power Transmission, Power Generation (CCGT), Car parking, Commercial, Automotive
- Location
- Illinois, United States of America
- Updated
- 3 Nov 2026
- Source
- Illinois Purchasing Group
ConstructChat
Ask ConstructChat about Park Improvements Markwoodlands Park
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | PART 1 : GENERAL 1 . 01 DESCRIPTION A . These general site work requirements apply to all site work operations . Refer to Division 2 specification sections for specific general , product , and execution requirements . 1 . 02 QUALITY ASSURANCE A . Comply with all applicable local , state , and federal requirements regarding materials , methods of work , and disposal of excess and waste materials . B . Obtain and pay for all required inspections , permits , and fees . Provide notices required by governmental authorities . 1 . 03 PROJECT CONDITIONS A . Locate and identify existing underground and overhead services and utilities within contract limit work areas . Provide adequate means of protection of utilities and services designated to remain . Repair utilities damaged during site work operations at Contractor ’ s expense . B . Arrange for disconnection , disconnect and seal or cap all utilities and services designated to be removed before start of site work operations . Perform all work in accordance with the requirements of the applicable utility company or agency involved . C . When uncharted or incorrectly charted underground piping or other utilities and services are encountered during site work operations , notify the applicable utility company immediately to obtain procedure directions . Cooperate with the applicable utility company in maintaining active services in operations . D . Locate , protect , and maintain bench marks , monuments , control points and project engineering reference points . Re - establish disturbed or destroyed items at Contractor ’ s expense . E . Perform site work operations and the removal of debris and waste materials to assure minimum interference with streets , walks , and other adjacent facilities . F . Obtain governing authorities written permission when required to close or obstruct street , walks and adjacent facilities . Provide alternate routes around closed or obstructed traffic ways when required by governing authorities . G . Control dust caused by the work . Dampen surfaces as required . Comply with pollution control regulations of governing authorities . H . Protect existing buildings , paving , and other services or facilities on site and adjacent to the site from damage caused by site work operations . Cost of repair and restoration of damaged items at Contractor ’ s expense . I . Protect and maintain street lights , utility poles and services , traffic signal control boxes , curb boxes , valves and other services , except items designated for removal . Remove or coordinate the removal of traffic signs , parking meters and postal mail boxes with the applicable governmental agency . Provide for temporary relocation when required to maintain facilities and services in operation during construction work . J . The Owner will occupy the premises and adjacent facilities during the entire period of construction . Perform site work operations to minimize conflicts and to facilitate Owner ’ s use of the premises and conduct of his normal operations . K . The Contractor shall stage the work in order to provide safe access to the building for all users , including those in mobility devices . |
Location
Country | United States of America (USA) |
State | Illinois |
Source
Source | Illinois Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Road, Power Transmission, Power Generation (CCGT), Car parking, Commercial, Automotive |
Article published date | 2026-04-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
