logo

Parking Lot Maintenance at Boone ’ s Trail Branch

Closed · Missouri · Last reported Mar 2026

Source: Missouri Purchasing Group

Tender
Closed

A . Contractor shall perform all work in a manner that minimizes disruption to the normal operations of the Project Site . Contractor shall coordinate all construction activities with Consultant and Owner to avoid interference with property access , parking , or other ongoing operations . B . Contractor shall perform

Status
Closed
Sector
Education, Car parking, Cement, Automotive
Location
Missouri, United States of America
Updated
3 Nov 2026
Source
Missouri Purchasing Group

ConstructChat

Ask ConstructChat about Parking Lot Maintenance at Boone ’ s Trail Branch

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Parking Lot Maintenance at Boone ’ s Trail Branch” is a tender record in Taiyo, linked to the Education sector. It is issued for works, goods, or services related to Missouri, United States of America.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

A . Contractor shall perform all work in a manner that minimizes disruption to the normal operations of the Project Site . Contractor shall coordinate all construction activities with Consultant and Owner to avoid interference with property access , parking , or other ongoing operations . B . Contractor shall perform work in accordance with the schedule of available workdays established by Owner . Owner retains the right to approve or reject proposed schedules and work hours . Owner acknowledges that maintaining a consistent and practicable schedule is essential to Contractor ’ s operational efficiency . If Owner - directed scheduling changes materially impact the project ’ s costs , Contractor may submit a written request for a Change Order , which shall be subject to review and written authorization by Consultant . Contractor shall prepare and submit to Consultant a written project schedule identifying anticipated start and completion dates for all major phases of work , including mobilization , site preparation , paving or concrete operations , cure periods , and cleanup . The schedule shall be submitted at least ten ( 10 ) business days prior to mobilization and shall be updated as required to reflect any approved changes in sequencing or timing . No work shall commence until the schedule has been reviewed and approved by Owner . Notification of the intended start date shall also be provided to Consultant at least ten ( 10 ) business days in advance of Contractor mobilization . D . Contractor shall assign a qualified on - site representative ( or representatives ) who is fully familiar with all scopes of work defined in this PSP and authorized to act on behalf of Contractor in all matters related to project execution , coordination , safety , and quality control . The Contractor Representative shall be present at the Project Site during all active work or shall remain immediately available to Consultant at all times . The Contractor Representative shall direct and supervise the activities of all Contractor personnel , subcontractors , and suppliers , ensuring that work is performed in full compliance with the requirements of this PSP and all applicable laws and safety standards . No change in the designated Contractor Representative shall be made without prior written notification to Consultant . Contractor shall ensure that all personnel and subcontractors under its control are properly trained , qualified , and equipped to perform their assigned work safely , efficiently , and to the quality standards specified in this PSP . E . All communications between Contractor and Owner shall occur solely through Consultant . F . All materials delivered to or used on the Project Site are subject to inspection and verification by Consultant . Inspections may be performed visually or through any methods deemed necessary by Consultant to confirm compliance with this PSP . G . Contractor shall provide Consultant with accurate total quantities of materials installed at the Project Site using the Material Request Form ( MRF ) issued by Consultant . The MRF shall be completed and submitted whenever requested by Consultant , including at project completion or prior to any invoice submission . Upon request , Contractor shall also provide original material delivery tickets for all materials used . All delivery tickets must be retained until the warranty period expires . Requested documentation shall be submitted within five ( 5 ) business days of Consultant ’ s request .

Location

Country

United States of America (USA)

State

Missouri

Source

Source

Missouri Purchasing Group

URL

More Details

Record type

Tender

Sector

Education, Car parking, Cement, Automotive

Article published date

2026-04-29

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender