logo

Passenger Boarding Bridge

Bids closed Apr 2026 · Maryland · Last reported Mar 2026

Source: Maryland Purchasing Group

Tender
Closed

The port is anticipating the new passenger boarding building to have a second story finished floor elevation of approximately + 28 ’ above the wharf deck elevation . The PBB would be expected to be able to accommodate a range of ship door elevations from + 20 MLLW to + 40 MLLW . The approximate length of

Status
Closed
Sector
Power Generation (CCGT), Manufacturing (Industrial), Seaport, Bridge, Commercial
Location
Maryland, United States of America
Updated
3 Nov 2026
Source
Maryland Purchasing Group

ConstructChat

Ask ConstructChat about Passenger Boarding Bridge

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Passenger Boarding Bridge” is a tender record in Taiyo, linked to the Power Generation (CCGT) sector. It is issued for works, goods, or services related to Maryland, United States of America.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

The port is anticipating the new passenger boarding building to have a second story finished floor elevation of approximately + 28 ’ above the wharf deck elevation . The PBB would be expected to be able to accommodate a range of ship door elevations from + 20 MLLW to + 40 MLLW . The approximate length of the PBB from the center of the rotunda directly to ship doors is 160 ’. The PBB is expected to be able to reach a range of distances from the rotunda to include potential angles of up to 50 ˚ as well to provide access to different size and style ships . The PBB should be airconditioned and heated for the wide range of weather in Baltimore for the comfort of the passengers . Request for Information 1 . What is your firm ’ s estimated engineering and design timeline once contracts have been executed for the PBB ? 2 . What is your firm ’ s estimated manufacturing timeline for the PBB once engineering and design have been completed and signed off by the Engineer ? 3 . Where do you typically manufacture the PBB ? 4 . What is a typical timeframe for shipping from the point of manufacture to Baltimore ? 5 . Is there special equipment needed at the port of delivery to offload the PBB ? 6 . What is the estimated amount of space required once the PBB is delivered to the port for assembly ? 7 . What is the estimated amount of time needed to assemble the PBB prior to connection to the passenger building ? 8 . What is the estimated amount of time needed to install the PBB on the passenger building and how long will the existing PBB be out of service ? 9 . Is there specific electrical and mechanical requirements that are needed to be able to provide power and HVAC to the PBB ? 10 . Do you have any sister companies within the US to provide an avenue for Buy America or Buy American products ? 11 . Are there aspects of the project that you believe are subcontractable ? Please provide the percentage recommendations for those pieces of the total contract . 12 . Are there challenges you foresee in Minority Business , Veteran Small Business , or small business participation ?

Location

Country

United States of America (USA)

State

Maryland

Source

Source

Maryland Purchasing Group

URL

More Details

Record type

Tender

Sector

Power Generation (CCGT), Manufacturing (Industrial), Seaport, Bridge, Commercial

Article published date

2026-04-08

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender