logo

Pavement Markings

The scope, dates and status of this tender. A free account opens every field.

Source: South Dakota Purchasing Group

Tender
Closed

BLACK HILLS NATIONAL FOREST This plan outlines the channels of responsibility for fire prevention and suppression activities and sets up an attack procedure in the event of a fire within the Project Area . The Project Area is defined as that area within the National Forest and within ½ mile of the

Status
Closed
Sector
Chemical (Industrial), Power Generation (CCGT), Water Supply and Storage, Manufacturing (Industrial), Road
Location
South Dakota, United States of America
Updated
3 Nov 2026
Source
South Dakota Purchasing Group

ConstructChat

Ask ConstructChat about Pavement Markings

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Pavement Markings” is a tender record in Taiyo, linked to the Chemical (Industrial) sector. It is issued for works, goods, or services related to South Dakota, United States of America.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

BLACK HILLS NATIONAL FOREST This plan outlines the channels of responsibility for fire prevention and suppression activities and sets up an attack procedure in the event of a fire within the Project Area . The Project Area is defined as that area within the National Forest and within ½ mile of the project right - of - way work areas and all roads used for construction purposes . I . Responsibilities 1 . Contractor 1 . Will cooperate with the District Ranger and / or Fire Management Officer in preparation of a fire plan , by furnishing necessary information on personnel , equipment and organization . 2 . Is responsible for and will direct all fire suppression activities within the project area until relieved by a Forest Service Representative or a South Dakota Wildland Fire Division Representative . 3 . Will make certain that prevention and suppression actions are in accord with contract requirements , including the fire plan . 4 . Will immediately notify authorities if a fire occurs . The following telephone numbers will be used . 911 Great Plains Dispatch Center – 605 - 399 - 3160 5 . Will delegate the second person in authority on the job to be responsible for the above activities when he or she is not on the project . 2 . Forest Service District Ranger or Delegated Fire Staff 1 . Is responsible for all fire prevention & suppression activities on the Ranger District in which the project is located . 2 . Will review the standard fire plan for adequacy and after discussing any need for changes with the Area Engineer , will add any specific provisions needed for the project . 3 . At least once on each project will accompany the Area Engineer on an inspection of compliance with the project fire requirements . The Area Engineer will notify the Contractor of corrective measures which must be taken when fire requirements are not being observed . II . Tools and Equipment 1 . Required Tools 1 . The Contractor will furnish and maintain in a serviceable condition ; one shovel , McLeod , or Pulaski for each of his employees ; to be used only for suppressing wildland fires . These tools will be kept in sealed boxes and available within the immediate working area . 2 . The Contractor will furnish one shovel and one fully charged fire extinguisher UL rate at 4 B : C or more on each truck , personal vehicle , tractor , grader , or other heavy equipment . For each welder he / she will furnish one shovel and one backpack fivegallon water - filled tank with pump ; for each gasoline power tool , including but not limited to chain saws , soil augers , rock drills , etc . one shovel or one chemical pressurized fire extinguisher , fully charged . The required fire tools shall , at no time , be farther than 25 feet from the point of operation of the power tool . Contractor will also furnish any other equipment called for elsewhere in the contract . a . Shovels will be size “ O ” or larger and will be not less than 35 inches in length . All fire tools and equipment required to be furnished by the Contractor will always be in good working condition .

Location

Country

United States of America (USA)

State

South Dakota

Source

Source

South Dakota Purchasing Group

URL

More Details

Record type

Tender

Sector

Chemical (Industrial), Power Generation (CCGT), Water Supply and Storage, Manufacturing (Industrial), Road

Article published date

2026-05-15

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender