logo

Pavement Preservation and Maintenance Services – District 3

Closed · Georgia · Last reported Apr 2026

Source: Georgia Purchasing Group

Tender
Closed

The Contractor will be required to perform prep work , removal , installation and cleanup for Pavement Preservation and Maintenance Services defined in this ITB . The Contractor shall supply labor , equipment , tools , means of transportation , traffic control , and incidentals to perform work in accordance to specificat

Status
Closed
Sector
Road
Location
Georgia, United States of America
Updated
3 Nov 2026
Source
Georgia Purchasing Group

ConstructChat

Ask ConstructChat about Pavement Preservation and Maintenance Services – District 3

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Pavement Preservation and Maintenance Services – District 3” is a tender record in Taiyo, linked to the Road sector. It is issued for works, goods, or services related to Georgia, United States of America.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

The Contractor will be required to perform prep work , removal , installation and cleanup for Pavement Preservation and Maintenance Services defined in this ITB . The Contractor shall supply labor , equipment , tools , means of transportation , traffic control , and incidentals to perform work in accordance to specifications , and to ensure a safe work environment for employees and the traveling public within the time schedule specified . Scope Work under this ITB consists of furnishing all labor , materials , tools , equipment , means of transportation , and incidentals necessary to perform the services . Contractor must furnish equipment in good operating condition and operated by properly trained and qualified personnel . The Contractor must make a good faith effort to furnish the Department the fully operational equipment needed to perform Pavement Preservation and Maintenance Services at such time , and at such location ( s ) as directed by the Engineer . Prior to start of work , Contractor must inspect equipment to ensure the equipment is fully operational for the performance of its intended purpose . The Contractor will also be responsible for any traffic control , licenses , and permits required to satisfy the duties required herein . Deliverables Delivery of Pavement Preservation and Maintenance Services shall be in accordance with the contract terms . The following deliverables are expected for work performed at the locations referenced in Exhibit 4 - Locations , Descriptions and Estimated Quantities . The contractor shall level and pave the road so to achieve the desired superelevation indicated by the plans . Quality Acceptance General Provisions 101 through 150 . All invoices shall be submitted with DBE forms in order for payment to be processed . The inspector shall be notified of the contractors intent to submit any invoice for payment to allow for inspection of areas to be invoiced for payment . Personnel and Sub - Contractors 4 . 1 Personnel Supervisor At all times , have on the work site as the Contractor ' s agent , a competent , English speaking Supervisor , thoroughly experienced in the type of work being performed . The Supervisor ’ s main duties are to supervise the work crew . Supervisor may serve as a Worksite Traffic Control Supervisor ( WTCS ) if properly certified . The Contractor ’ s Supervisor shall : 1 . Have a working cell phone with them during duty hours 2 . Must be available at the work site when the work is being performed under this Contract , and as requested ; 3 . Act as the Contractor ’ s authorized agent in all communications with the Department 4 . Shall be responsible for inspecting and reporting the need for major or emergency work to the Engineer immediately . Crew Utilize the same crew ( s ) to perform the work in accordance with the requirements herein , whenever possible , so that the personnel can remain familiar with the Project . 1 . Provide staff and staffing levels able to perform the work in accordance with the requirements herein . 2 . Use personnel who are competent , experienced , and skilled in all aspects of Pavement Preservation and Maintenance Services . The personnel performing these services will be under the sole responsibility of the Contractor . 4 . 2 Subcontractors The Department expects the awarded contractor to be fully able to complete the Work as detailed in this ITB . The Department may consider the use of subcontractors to accomplish the work . All requests to utilize a subcontractor must be submitted in writing and include the following ; Appendix 4 Subcontractor Request Form A notarized copy of Appendix 5 Georgia Security and Immigration Compliance Act Affidavit ( Subcontractor ) A minimum of ten ( 10 ) working days is needed to evaluate a request . If the Department approves the use of a subcontractor , the Contractor will be held wholly responsible for the actions , quality , and timeliness of all work performed by the subcontractor . The Department will communicate with the Contractor ’ s Supervisor regarding all work . Determination of whether a subcontractor is approved is the sole decision of the Department . Traffic Control Plan Maintain traffic during the prosecution of the Work and provide , install , and maintain all traffic control devices in accordance with the approved Traffic Control Plans , Standard Specifications , and the current edition of the Manual of Uniform Traffic Control Devices ( MUTCD ). All lane closures require prior approval from the Department . Dates and times of closures shall be requested ( 2 ) two weeks prior to installation . Utilize complete and proper traffic control and traffic control devices during all operations . All traffic control and traffic control devices required for any operation shall be functional and in place prior to the commencement of that operation . Signs for temporary operations shall be removed during periods of inactivity . Leave the project in a manner that will be safe to the traveling public and which will not impede motorists .

Location

Country

United States of America (USA)

State

Georgia

Source

Source

Georgia Purchasing Group

URL

More Details

Record type

Tender

Sector

Road

Article published date

2026-04-29

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender