logo
TenderClosed

Pavement Rehab of CR - 880 from MLK JR Blvd . E . to US - 98

The scope, dates and status of this tender. A free account opens every field.

Source: Florida Purchasing Group

The purpose of this project is to rehabilitate a 19 . 7 - mile section of Canal Street / CR 880 pavement from MLK Jr . Blvd to east of US - 98 / Southern Blvd . Project includes moving the existing roadway crown several feet to the south , away from the L - 13 / l - 14 canals , and minor widening to construct

Status
Closed
Sector
Water Supply and Storage, Bridge, Road
Location
Florida, United States of America
Updated
3 Nov 2026
Source
Florida Purchasing Group

ConstructChat

Ask ConstructChat about Pavement Rehab of CR - 880 from MLK JR Blvd . E . to US - 98

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Pavement Rehab of CR - 880 from MLK JR Blvd . E . to US - 98” is a tender record in Taiyo, linked to the Water Supply and Storage sector. It is issued for works, goods, or services related to Florida, United States of America.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

The purpose of this project is to rehabilitate a 19 . 7 - mile section of Canal Street / CR 880 pavement from MLK Jr . Blvd to east of US - 98 / Southern Blvd . Project includes moving the existing roadway crown several feet to the south , away from the L - 13 / l - 14 canals , and minor widening to construct new shoulders . The existing pavement structure is built on top of muck . It is not feasible to do a full reconstruction at this time . Existing guardrail is to remain and will be replaced in a future project . Additional services include but are not limited to roadway design , signing and pavement marking , survey , photogrammetry , minor structures at bridge approaches , and geotechnical . Signalization , lighting , landscape are included , however , only minor work is anticipated . Full survey will be provided by the Department , however , the survey work types have been included to cover any incidental additional survey needs during design . This project is a pavement rehabilitation , not a full reconstruction . Project does not include muck removal . Only temporary lane closures will be allowed . Project has an accelerated design schedule with construction in FY 28 .

Location

Country

United States of America (USA)

State

Florida

Source

Source

Florida Purchasing Group

URL

More Details

Record type

Tender

Sector

Water Supply and Storage, Bridge, Road

Article published date

2026-05-01

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender