logo

Pavement Repair

Sector: Bridge • Location: Memphis, Tennessee, United States of America

Source: SAM.gov

Tender
Combined Synopsis/Solicitation

The entire paved area at the Memphis Cotton Classing Facility is in a severe state of disrepair and must be replaced. The surfaces were first paved in 1995. There is poor drainage and water intrusion to the subbase, leading to severe degradation. Solicitation documents are posted below. Amendment 1 is posted below. Regarding amendment 1 incorporating pavement striping, acrylic paint is required, a

Status
Prospective
Sector
Bridge, Raw Materials, Commercial, Car parking, Residential, Automotive, Water Supply and Storage, Road
Location
Memphis, Tennessee, United States of America
Updated
3 Nov 2026
Source
SAM.gov

ConstructChat

Ask ConstructChat about Pavement Repair

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Pavement Repair” is a tender record in Taiyo, linked to the Bridge sector. It is issued for works, goods, or services related to Memphis, Tennessee, United States of America.

Participants

Not available for this record.

Status

Original status

combined synopsis/solicitation

Taiyo status

Prospective

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

The entire paved area at the Memphis Cotton Classing Facility is in a severe state of disrepair and must be replaced. The surfaces were first paved in 1995. There is poor drainage and water intrusion to the subbase, leading to severe degradation. Solicitation documents are posted below. Amendment 1 is posted below. Regarding amendment 1 incorporating pavement striping, acrylic paint is required, and the striping should match existing. RFIs: Can you provide the dimensions of the sink hole that was covered and how you would like to fill it? See photos below for dimensions. Clear the hole, dig out the debris, fill with appropriate material (ie, 3/4 “ gravel), asphalt with back lot. With this being in 3 phases, will the project require 3 mobilizations? Depending on the necessary schedule, yes it may. RFI: Is the intent of this project to preserve as much of the subgrade as possible? Or is the intent to replace the entire subgrade? The intent is to preserve where it can be preserved and replace where necessary to provide a parking area that does not retain water, drains properly, and is appropriately sloped. While at the same time having a finished parking lot that will not deteriorate prematurely due to subgrade preservation. Preserve it to the extent it makes sense to do so. There is no specific requirement to replace it all. Additionally, fog seal is not required. Amendment 2 is posted below. The closing date for quotes is extended to May 29. Amendment 3 is posted below

Original sector

Construction

Location

Country

United States of America (USA)

State

Tennessee

City

Memphis

Source

Source

SAM.gov

URL

More Details

Record type

Tender

Sector

Bridge, Raw Materials, Commercial, Car parking, Residential, Automotive, Water Supply and Storage, Road

Article published date

2026-05-20

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender