Pavement Repair
Sector: Bridge • Location: Memphis, Tennessee, United States of America
Source: SAM.gov
The entire paved area at the Memphis Cotton Classing Facility is in a severe state of disrepair and must be replaced. The surfaces were first paved in 1995. There is poor drainage and water intrusion to the subbase, leading to severe degradation. Solicitation documents are posted below. Amendment 1 is posted below. Regarding amendment 1 incorporating pavement striping, acrylic paint is required, a
- Status
- Prospective
- Sector
- Bridge, Raw Materials, Commercial, Car parking, Residential, Automotive, Water Supply and Storage, Road
- Location
- Memphis, Tennessee, United States of America
- Updated
- 3 Nov 2026
- Source
- SAM.gov
ConstructChat
Ask ConstructChat about Pavement Repair
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | combined synopsis/solicitation |
Taiyo status | Prospective |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | The entire paved area at the Memphis Cotton Classing Facility is in a severe state of disrepair and must be replaced. The surfaces were first paved in 1995. There is poor drainage and water intrusion to the subbase, leading to severe degradation. Solicitation documents are posted below. Amendment 1 is posted below. Regarding amendment 1 incorporating pavement striping, acrylic paint is required, and the striping should match existing. RFIs: Can you provide the dimensions of the sink hole that was covered and how you would like to fill it? See photos below for dimensions. Clear the hole, dig out the debris, fill with appropriate material (ie, 3/4 “ gravel), asphalt with back lot. With this being in 3 phases, will the project require 3 mobilizations? Depending on the necessary schedule, yes it may. RFI: Is the intent of this project to preserve as much of the subgrade as possible? Or is the intent to replace the entire subgrade? The intent is to preserve where it can be preserved and replace where necessary to provide a parking area that does not retain water, drains properly, and is appropriately sloped. While at the same time having a finished parking lot that will not deteriorate prematurely due to subgrade preservation. Preserve it to the extent it makes sense to do so. There is no specific requirement to replace it all. Additionally, fog seal is not required. Amendment 2 is posted below. The closing date for quotes is extended to May 29. Amendment 3 is posted below |
Original sector | Construction |
Location
Country | United States of America (USA) |
State | Tennessee |
City | Memphis |
Source
Source | SAM.gov |
URL |
More Details
Record type | Tender |
Sector | Bridge, Raw Materials, Commercial, Car parking, Residential, Automotive, Water Supply and Storage, Road |
Article published date | 2026-05-20 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Bridge tenders in United States of America
- FY2023 Patch Truck
- 20222023 Bridge Preventive Maintenance Program
- Small Bridge Design Services Various Locations throughout Ocean County
- Pipeline Trail Phase 1 Project
- Construction Engineering Inspection Services for FDOT LAP Bridge Projects
- Miccosukee Road Bridge Replacement
- Bridge Design Services 3 Bridges on CTH BB CTH N and CTH TT
- Emergency Repairs to HHW & Power Facilities Following the Ma...
