Paving Related Road Reclamation
The scope, dates and status of this tender. A free account opens every field.
Source: Connecticut Purchasing Group
The Contractor shall furnish all labor , tools , supplies , and other facilities and means necessary or proper to perform operations as described , and to include all handwork as necessary for the completion of reclaiming , and all related work . The contractor is responsible for setting the rough and final gra
- Status
- Closed
- Sector
- Water Supply and Storage, Road
- Location
- Connecticut, United States of America
- Updated
- 3 Nov 2026
- Source
- Connecticut Purchasing Group
ConstructChat
Ask ConstructChat about Paving Related Road Reclamation
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | The Contractor shall furnish all labor , tools , supplies , and other facilities and means necessary or proper to perform operations as described , and to include all handwork as necessary for the completion of reclaiming , and all related work . The contractor is responsible for setting the rough and final grading after reclaiming , so the roadway grades will shed storm water . The final grade shall be approximately 2 to 3 % from centerline of road to gutter . Following reclaiming , the city will provide and deliver additional base materials if necessary . Raised structures must be painted in fluorescent orange paint following all reclaiming operations . The contractor must install filter fabric in basin covers to prevent road materials from washing into the storm water system . A water truck must be used as necessary to control dust following reclaiming until paving base course is complete . The contractor must provide proper base compaction . Compaction is critical elements to road life . Maintaining the road surface is the contractor ’ s responsibility from initial reclamation to paving . |
Location
Country | United States of America (USA) |
State | Connecticut |
Source
Source | Connecticut Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Water Supply and Storage, Road |
Article published date | 2026-03-27 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Water Supply and Storage tenders in United States of America
- RFP - Thurston County Lake Management Districts Submerged Aquatic Vegetation Control
- Coatings for Wet Well and Manholes
- Sole Source for Wedeco UV BulbsBallets
- Security Hardware Services
- Chambers Creek Regional Wastewater Treatment Plant BNR Aeration Basin Airflow Meters
- Se Dixie Highway County Road A1A Utility Relocation Project
- UNPAINTED SNOW FENCE AND DUNE GRASS NO II
- PreQualification of Bidders for Chaboya Improvements
