logo

PE3 Blue Light Innovation

The scope, dates and status of this tender. A free account opens every field.

Source: Find a Tender Service (UK)

Tender
Complete

This requirement is for the delivery of a production-ready digital planning tool that enables emergency services (Police, Fire and Rescue, and Ambulance Trusts) to effectively plan and deliver the decarbonisation of their vehicle fleets and operational estates. The solution must support strategic electrification planning, improve visibility of electricity network headroom, and reduce the likeliho

Status
Closed
Sector
Electric Vehicles (EVs), Solar, Bridge, Energy Storage, Road, Automotive, Power Generation (CCGT)
Location
United Kingdom
Updated
3 Nov 2026
Source
Find a Tender Service (UK)

ConstructChat

Ask ConstructChat about PE3 Blue Light Innovation

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “PE3 Blue Light Innovation” is a tender record in Taiyo, linked to the Electric Vehicles (EVs) sector. It is issued for works, goods, or services related to United Kingdom.

Participants

Not available for this record.

Status

Original status

complete

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

This requirement is for the delivery of a production-ready digital planning tool that enables emergency services (Police, Fire and Rescue, and Ambulance Trusts) to effectively plan and deliver the decarbonisation of their vehicle fleets and operational estates. The solution must support strategic electrification planning, improve visibility of electricity network headroom, and reduce the likelihood of unnecessary or premature network reinforcement, while embedding the operational resilience requirements unique to blue light organisations. The requirement builds directly on the outputs of the completed Phase 1 innovation activity, which validated user need, defined functional and non-functional requirements, and produced tested wireframes and user journeys with engagement from over 60 emergency service organisations. The scope of this commission is therefore delivery focused, translating those agreed designs into an operational system rather than rerunning discovery or design activity. Core Functional Requirements: The supplier is required to deliver a minimum viable product (MVP) that provides an endto-end planning journey for a defined set of emergency service sites, including: - A guided workflow enabling users to model fleet electrification, estate electrification, and associated load impacts. - Visibility of site-level electrical capacity and network headroom, including constraint indicators and reinforcement triggers. - Scenario modelling to assess different decarbonisation pathways, including: - ICE-to-EV fleet replacement logic, charger sizing and charging profiles. - Specialist vehicle considerations. - Heat pump, solar PV, battery storage and smart charging options. - Indicative costs, timescales, and lead-time estimates to support funding, business case development, and connection decisions. - Portfolio-level aggregation to support roadmap development and prioritisation (post-MVP expansion). Technical and Delivery Requirements : The solution must: -Be delivered as a logically separate, multi-tenanted application built on the existing UKPN ChargePoint Navigator platform and infrastructure, enabling interaction with UKPN systems such as Smart Gateway, NetMap, Autoquote and connection application services. - Configure and extend existing backend services, data models and APIs to operationalise the agreed wireframes. - Integrate multiple datasets, including estate data, fleet data, and network capacity information, with appropriate validation, error handling and feedback mechanisms. - Comply with UK Power Networks' cybersecurity, information governance, and Azure hosting requirements, including agreed authentication and SSO arrangements. - Be designed from the outset for replication, scale, and transition to business-as-usual (BAU) The MVP must be production-ready by March 2026 to meet project and customer timelines and to generate evidence for wider rollout decisions.

Location

Country

United Kingdom (UK)

Source

Source

Find a Tender Service (UK)

URL

More Details

Record type

Tender

Sector

Electric Vehicles (EVs), Solar, Bridge, Energy Storage, Road, Automotive, Power Generation (CCGT)

Article published date

2026-09-21

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender