Peace and Prosperity Rehab Program
Sector: Steel • Location: United States
Source: miamidade
Eliazar Cruz 16160 SW 305 Ter Homestead FL, 33033 (786) 765-6829 Exterior Repairs: Permits and inspections are required for all work 1) Re-Roof Complete: Pitched Deck Roofing General Specification All repairs and/or installations of new roof system shall comply with requirements of the Miami-Dade County Building Department and The Florida Building Code Test Protocol for Hi
- Status
- Bidding
- Sector
- Steel, Metal, Commercial, Residential
- Location
- United States of America
- Updated
- 3 Nov 2026
- Source
- miamidade
ConstructChat
Ask ConstructChat about Peace and Prosperity Rehab Program
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | open |
Taiyo status | Bidding |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | Eliazar Cruz 16160 SW 305 Ter Homestead FL, 33033 (786) 765-6829 Exterior Repairs: Permits and inspections are required for all work 1) Re-Roof Complete: Pitched Deck Roofing General Specification All repairs and/or installations of new roof system shall comply with requirements of the Miami-Dade County Building Department and The Florida Building Code Test Protocol for High Velocity Hurricane Zones. All valley and eave drips shall be replaced with new and secured with ring shank galvanized nails. Nails shall not penetrate through the sheathing at any visible spot. All plumbing flashing must be replaced with new lead flashing. And vents and stacks protruding through the roof shall be replaced with new vents or stacks. End joints shall be made over rafters, and all eves drip shall be backed with pressure treated 1X2 furring strips. NOTE #1 Include in your price the 1st 100 sf for replacement of any damaged or deteriorated sheathing and or decking. NOTE #2 Roof ventilation as per FBC R806.1, R806.2. Replace existing soffit vents with new ones. Ventilation openings shall have a least dimension of 1/16 inch (1.6 mm) minimum and 1/4 inch (6.4 mm) maximum. Ventilation openings having at least dimensions larger Then 1/4 inch (6.4 mm) shall be provided with corrosion-resistant wire cloth screening, hardware cloth, perforated vinyl or similar material with openings having a least dimension of 1/16 inch (1.6 mm) minimum and 1/4 inch (6.4 mm) maximum. NOTE #3 Contractors are responsible for providing all necessary protection from the weather during all phases of roofing operation. NOTE #4 All materials, installation and inspections shall be in accordance with the Florida Building Code and approved by MDC product control division. NOTE #5 Plywood for roof overhang and sheathing, roof sheathing, the FBC R803.2.2 specifies a minimum nominal thickness of 19/32 inch (5/8"). For general roof sheathing, the minimum thickness is 7/16 inches. NOTE #6 Wood Structural Panel Soffits: (FBC) Section 1410.6 Must meet a minimum panel performance category of 3/8, use corrosion-resistant fasteners, and comply with installation guidelines outlined in the code and associated figures, such as placing the strength axis perpendicular to support. Grade and rating: The code requires roof sheathing plywood to be rated for "Exposure” 1," which indicates it is suitable for applications where it will be exposed to moisture during construction. A span rating label must also be present on the panels. Provide smooth face plywood for painting. • SPECIFICATIONS FOR ROOF DECK REPAIRS: SPECIFICATIONS FOR SOFFIT AND FASCIA REPAIRS: Replacement of existing fascia and soffit to match existing. No splicing shall be less than 5 ft. in length. All joints shall fall on framing and must be mitered at 45 degrees on runs and corners, no butt joints allowed. New wood to be primed and painted. Replace all continuous exhaust vents in soffits for roof ventilation. Contractor shall be responsible for obtaining exact dimensions of all soffits, fascia, and continuous exhaust vents to be replaced. DISCOVERY OF HIDDEN DAMAGE: For all additional or hidden damage discovered after bid award, call a joint meeting with the Project Manager to determine actual quantities. Re-nail entire deck according to Code and replace defective or damaged sheathing with plywood or tongue & groove as per code. Include in your bid first 100 Sq. Ft. of decking material. Include with your proposal the cost of replacing the first 100 SQ/FT of plywood roof deck. 1a) Re-Roof, Complete: Pitched Deck SHINGLES: Remove existing roof cover including accessories and flashing and replace any damaged sheathing as per specifications below. Install two layer of # 30 felt nailed per Code, re-install required accessories, and vent stacks, flashings and edge drip. Install GAF Timberline HD architectural fungus resistant shingles carrying UL label on package and approved by MDC product Control Division; minimum pitch 2-1/2 /12. No Maximum. Install as per the Florida Building Code and manufactures specifications. Provide inspection approval, release of lien, and 1 year for warranty for materials, labor defects and workmanship, and 10-year warranty against defects in workmanship for the installation of the roofing system, shingle color selection by owner. Note: Include In your cost for repairs and or replacement of damaged fascia, soffit, and attic venting. $______________ Unit Prices for Additional Work Additional Work Unit Price Additional roof sheathing beyond first 100 SF $/SF $____________ Additional roof framing 2x6, 2x8. $/LF $____________ Additional fascia board per lineal foot $/LF $____________ Additional soffit per square foot $/SF $____________ Additional soffit venting: Continues venting ? Round ? perforated ? Rectangular ? $/SF $____________ Other additional work, if applicable $____________ 2) Exterior Door Replacement: Permits and inspections are required. Remove existing front entry door, remove existing side door. Furnish & Installation of a new, 6 panel, steel, insulated, pre-hung doors, with all needed hardware, trim, and lockset. Including the handle/knob and the lock, door to be painted. Owner to select color • Doors must have NOA approved by Miami-Dade County and/or Current FBC approval. • Provide Peep hole as required at front entrance door as per code. • The door is to swing out with code required security hinges. • Provide industry standard trim on outside and inside (casing mold) Miami Dade County, industry-standard trim (molding) for residential construction uses moisture-resistant materials • Patch stucco surface around door to match existing finish. • Paint Door and trim to match existing paint color and finish. NOTE: CONTRACTOR IS RESPONSIBLE FOR VERIFYING ALL EXISTING DOOR OPENINGS FOR SIZES AND EXISTING STRUCTURAL CONDITIONS BEFORE ORDERING AND INSTALLING THE NEW DOORS. Locations: Front: 36” x 80” LH OS (Code Approved) Side entrance 32” x 80” LH, OS (Code Approved) $______________ 3) Window Replacement: Permits and inspections are required. * Furnish & install: New horizontal roller, full lite windows with impact resistant glass with gray tint in existing window openings. * The windows shall be made of aluminum with insect screens and locking mechanism. * Windows are to be approved by Miami Dade County “NOA” and or the state of Florida Building Code. * Installed as per manufacturer specifications. * Patch all work and finishes to match existing finishes, on both interior and exterior surfaces. * Remove all debris including “iron bars” and dispose of at an approved site. * Provide approved Building Permit card. Total Window Openings: 9. Plus one sliding door North: 37” X 50”, 37” X 50”, 74” X 50” East: 37” X 50” South: 37” X 38”, 37” X 26”, 37” X 26”, 37” X 50”, 72” X 80” SGD. West: 37” X 50” Note: Remove Iron Bars NOTE: CONTRACTOR IS RESPONSIBLE FOR VERIFYING ALL EXISTING WINDOW OPENINGS FOR SIZES AND EXISTING STRUCTURAL CONDITIONS BEFORE ORDERING AND INSTALLING THE NEW WINDOWS. $________________ Total Cost: $_____________ |
Original sector | Construction |
Location
Country | United States of America (USA) |
Source
Source | miamidade |
URL |
More Details
Record type | Tender |
Sector | Steel, Metal, Commercial, Residential |
Article published date | 2026-10-23 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Steel tenders in United States
- Mill and overlay, replacement of 1 structure; Involving stripping, storing, and placing topsoil, excavation, reinforcing subgrade, placing road base, asphalt pavement, structural steel, riprap, and structural concrete, and installing fence on WYO 59
- Bridge rehabilitation and electrical upgrades; Involving removing concrete, excavation, replacing concrete slabs, placing structural steel, installing bridge railing and sheet piles, placing approach slabs, riprap, bridge deck overlay, and structural
- Bridge rehabilitation and electrical upgrades; Involving removing concrete, excavation, replacing concrete slabs, placing structural steel, installing bridge railing and sheet piles, placing approach slabs, riprap, bridge deck overlay, and structural
- Bridge replacement (1 concrete bridge); Involving installing cofferdams, removing one concrete bridge, placing structural steel, installing bridge railing, pedestrian railing, and steel piling, placing riprap, and installing reinforcing steel and pla
- Bridge replacement (1 Structure); Involving removing one steel bridge, excavation, grading, placing road base and prestressed precast concrete girders, installing bridge railing and steel piling, placing riprap, installing reinforcing steel, and plac
- DR19309, DR19004 & DR19622 combined Bridge repairs (3 structures); Involving installing controls for lead paint removal, removing concrete, placing structural steel, installing bridge railing, paint removal and repair, and repairing structural concre
- Slide Repair; Involving excavation; stripping, storing, and placing topsoil; placing erosion control measures, asphalt pavement, slide stabilization rock, and shotcrete; and installing reinforcing steel and timber lagging on US 26/89 beginning at RM
- Slide Repair; Involving excavation; stripping, storing, and placing topsoil; placing erosion control measures, asphalt pavement, slide stabilization rock, and shotcrete; and installing reinforcing steel and timber lagging on US 26/89 beginning at RM
