Pest Control Services for IDJC
Location: Idaho, United States of America
Source: Idaho Purchasing Group
Scope of Work : A . 1 Scenarios See the Scenarios in Exhibit B – Price Sheet for the services as of the issuance of the RFQ . The requirements in those Scenarios are considered to be part of the Scope of Work . A . 2 Contractor Responsibility The Contractor shall provide all that is necessary to provid
- Status
- Closed
- Location
- Idaho, United States of America
- Updated
- 3 Nov 2026
- Source
- Idaho Purchasing Group
ConstructChat
Ask ConstructChat about Pest Control Services for IDJC
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | Scope of Work : A . 1 Scenarios See the Scenarios in Exhibit B – Price Sheet for the services as of the issuance of the RFQ . The requirements in those Scenarios are considered to be part of the Scope of Work . A . 2 Contractor Responsibility The Contractor shall provide all that is necessary to provide pest control services including but not limited to all supervision , labor , equipment , materials , tools , chemicals and transportation . A . 3 No Storage at JCCs The Contractor must not store anything at any JCC . A . 4 Chemicals A . 4 . 1 All chemicals used by the Contractor in providing pest control services to the JCC ( s ) must not be prohibited from use by federal , state or local laws . A . 4 . 2 Chemicals used at JCCs shall be non - staining . A . 4 . 3 The Contractor must not dilute or mix chemicals on JCC property , except in or at the Contractor ’ s service vehicle , at a location on the property approved in writing by the JCC contact for the JCC where pest control services are being performed . A . 4 . 4 For spraying in food preparation areas , food service areas and dining areas the Contractor must use chemicals that are designed for use in such areas . The Contractor must also take precautions to protect food and surfaces where food is prepared from being sprayed . A . 4 . 5 All chemicals used in public areas , food preparation areas , food service areas and dining areas must be non - toxic . Chemicals deadly to pests but reasonably non - hazardous to humans ( in particular , juveniles ) may be used in public areas , food preparation areas , food service areas and dining areas . A . 4 . 6 When nests of stinging or biting pests are found in public areas , and pose a public health issue , a public safety issue or both , the Contractor may seek approval from the JCC contact to use toxic chemicals to eliminate such pests on a case by case basis . The Contractor must obtain the JCC contact ’ s approval in writing . Toxicity in the area treated must completely dissipate within twenty - four ( 24 ) hours of application . A . 4 . 7 Upon request , the Contractor shall provide current MSDS sheets for the chemicals to be used at the JCCs . |
Location
Country | United States of America (USA) |
State | Idaho |
Source
Source | Idaho Purchasing Group |
URL |
More Details
Record type | Tender |
Article published date | 2026-05-11 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More infrastructure tenders in United States of America
- RFP - Pro-Tem Hearing Examiner
- RFP - Thurston County Lake Management Districts Submerged Aquatic Vegetation Control
- Coatings for Wet Well and Manholes
- Veteran Transportation
- Countywide Vending Machine Services with Healthy Options
- Temporary Staffing Services Local and National
- NEW TIRES RETREADS AND TIRE SERVICES
- Youth Suicide Prevention Programming
