Pettigo Mill Renewable Energy Hub Phase 1 — Mechanical and Electrical Installation and Integration
Sector: Geothermal • Location: Ireland
Source: Office of Government Procurement, Ireland
Open procedure for the supply, installation, testing and commissioning of mechanical and electrical services at Pettigo Mill, Co. Donegal, as part of Phase 1 of the Pettigo Mill Renewable Energy Hub — the conversion of a heritage corn and saw mill complex (RPS 40850001 and RPS 40850002) into a rural enterprise and renewable energy hub. The Works comprise an integrated mechanical, electrical and re
- Status
- Bidding
- Sector
- Geothermal, Energy Storage, Solar, Water Supply and Storage, Government, Telecommunications, Commercial, Residential
- Location
- Ireland
- Updated
- 3 Nov 2026
- Source
- Office of Government Procurement, Ireland
ConstructChat
Ask ConstructChat about Pettigo Mill Renewable Energy Hub Phase 1 — Mechanical and Electrical Installation and Integration
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | active |
Taiyo status | Bidding |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | Open procedure for the supply, installation, testing and commissioning of mechanical and electrical services at Pettigo Mill, Co. Donegal, as part of Phase 1 of the Pettigo Mill Renewable Energy Hub — the conversion of a heritage corn and saw mill complex (RPS 40850001 and RPS 40850002) into a rural enterprise and renewable energy hub. The Works comprise an integrated mechanical, electrical and renewable energy package, presented in two technical sections for clarity of pricing and scope: Section A (Climatic and Energy Elements): Water Source Heat Pump (16-20 kW, COP ≥4.0) with river collectors and thermal storage; 8.5 kWp Building Integrated Photovoltaic (BIPV) solar glass with 10 kW hybrid inverter and 10.24 kWh battery storage; MVHR ventilation system. Section B (General Building Services): electrical distribution and lighting; fire detection and alarm to IS 3218:2013; structured Cat6 cabling; plumbing and sanitary services; heritage-sensitive builders' work in connection; commissioning and handover. The two sections are technically and functionally interdependent and form a single integrated contract. Award is based on the combined Total Tender Price for Sections A and B. Planning permission has been granted (Ref 25/60156, Donegal County Council, 4 September 2025). Contract form: PW-CF6 Short Public Works Contract. Award criterion: Lowest Price. Construction period: 24 weeks. Tenderers must hold MCS Certification (or recognised equivalent) for renewable installations and demonstrate prior experience of heritage building works. |
Location
Country | Ireland |
Source
Source | Office of Government Procurement, Ireland |
URL |
More Details
Record type | Tender |
Sector | Geothermal, Energy Storage, Solar, Water Supply and Storage, Government, Telecommunications, Commercial, Residential |
Article published date | 2026-06-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Geothermal tenders in Ireland
- LA3652C - RFT for the Supply, Delivery and Installation of an Advanced 3D Printing Suite (4 Lots) for Technological University of the Shannon: Midlands Midwest (TUS)
- Killeigh NS- Roof Repairs
- Upgrade of HVAC system - NML
- Consultancy Services for a Feasibility Study on Plant and Systems Focussed Decarbonisation Solutions including Geothermal Study at Garda Training College, Templemore, Co. Tipperary
- The provision of Geothermal technical services to Geological Survey Ireland for the GEMINI project
- 0012 - The Provision of Epson Toners
- Supply of Manual Catering Sealing Machines and Consumables
- NCTR2501 Single Party Framework Agreement for the Provision of Design, Supply, Install, Commissioning and Integration of a Facility Management System at Technological University Dublin
