Pharmacy B201 Chiller One Time Repair
One of 10,000+ tenders Taiyo tracks in Oregon.
Source: SAM.gov
The Purpose of Amendment 0002 is to provide additional details as to the chiller in need of repair and the control type utilized in the operation of the chiller. Please see Attachment 1 for the chiller specifications. Solicitation closes 12/10/2025 at 10:00AM PST. The purpose of amendment 0001 is to correct an administrative error in the due date on the solicitation and to comment on industry feed
- Status
- Closed
- Sector
- Residential, Commercial
- Location
- White City, Oregon, United States of America
- Updated
- 3 Nov 2026
- Source
- SAM.gov
ConstructChat
Ask ConstructChat about Pharmacy B201 Chiller One Time Repair
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | solicitation |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | The Purpose of Amendment 0002 is to provide additional details as to the chiller in need of repair and the control type utilized in the operation of the chiller. Please see Attachment 1 for the chiller specifications. Solicitation closes 12/10/2025 at 10:00AM PST. The purpose of amendment 0001 is to correct an administrative error in the due date on the solicitation and to comment on industry feedback. Solicitation closes 12/10/2025 at 10:00AM PST. Objective: To provide a complete repair of the Pharmacy Chiller located in Building 201 at the VA Southern Oregon Rehabilitation Center and Clinics (VA SORCC). Tasks: Recover the refrigerant from circuit one of the chiller. Remove the existing Electronic Expansion Valve (EEV) and install a new EEV. Install a new EEV cable from the controller to the new EEV. Install new filter dryers. Conduct a pressure test to check for system leaks. Recharge the system with the recovered refrigerant. Test the entire system to ensure proper functionality. If issues remain unresolved, investigate potential software problems with the chiller. Reprogram the chiller software as necessary to achieve a complete repair. Deliverables: Successful recovery and reuse of refrigerant. Installation of a new EEV and EEV cable. New filter dryers installed. System pressure test results documenting no leaks. System recharge and performance test. Detailed report of any software issues found and actions taken to reprogram the system. VA has already identified these items are among repairs needed, but this is not set out as an exhaustive list, The contractor is responsible for ensuring the chiller operates efficiently and resolving all persistent issues, including any software-related problems. All deliverables must be completed to confirm the repair is thorough and comprehensive. |
Original sector | Construction |
Location
Country | United States of America (USA) |
State | Oregon |
City | White City |
Source
Source | SAM.gov |
URL |
More Details
Record type | Tender |
Sector | Residential, Commercial |
Article published date | 2026-02-12 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
