Phase 1 Habitat Assessment Northern Long - Eared Bat
The scope, dates and status of this tender. A free account opens every field.
Source: New Hampshire Purchasing Group
I . Complete Phase 1 report will include the following : 1 . Full names and relevant titles / qualifications of individuals completing the habitat assessment and when the assessment was conducted . 2 . A map and latitude / longitude or UTM clearly identifying the project location and boundaries . 3 . Detailed project
- Status
- Closed
- Sector
- Bridge
- Location
- New Hampshire, United States of America
- Updated
- 3 Nov 2026
- Source
- New Hampshire Purchasing Group
ConstructChat
Ask ConstructChat about Phase 1 Habitat Assessment Northern Long - Eared Bat
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | I . Complete Phase 1 report will include the following : 1 . Full names and relevant titles / qualifications of individuals completing the habitat assessment and when the assessment was conducted . 2 . A map and latitude / longitude or UTM clearly identifying the project location and boundaries . 3 . Detailed project description . 4 . Documentation of any known / occupied spring staging , summer , fall swarming , winter habitat , and / or bridge / culvert roosts for NLEB within or near the project . 5 . A description of methods used during the habitat assessment . 6 . A summary of the assessment findings and complete Bat summer Habitat Assessment Datasheet ( Appendix B ). 7 . Other information that may have a bearing on use of the project area . 8 . A Phase 1 Habitat Assessment on all potential hibernacula that could be aƯected by the proposed project if necessary . 9 . A Step 1 Initial Assessment of Suitability and Safety on all bridges and culverts that could be aƯected by the proposed project if necessary . 1 II . If a proposed project may aƯect ( positively or negatively ) the NLEB prepare a draft study plan for the Phase 2 ( acoustic or netting ) and / or Phase 5 ( potential hibernaculum ) survey ( s ) ( if suitable habitat ( s ) is present ). Phase 2 Study Plans should contain the following : 1 . A statement as to which type of P / A surveys will be conducted was calculated / determined . 2 . A map depicting the proposed number of survey sites ( mist netting and / or acoustic ) and their tentative distribution throughout the project area . 3 . A tentative list of surveyor names and copies of relevant federal permits ( if applicable ). 4 . A tentative survey schedule ( e . g ., start date , duration , end date ); 5 . For mist - netting surveys with planned Phase 4 radio - tracking : the approximate number and distribution of transmitters and a request that bats targeted for tracking may be held for up to 30 minutes to allow for application of transmitters . 6 . For acoustic surveys : information on which specific program ( s ) will be used and what level of acoustic analyses will be conducted . |
Location
Country | United States of America (USA) |
State | New Hampshire |
Source
Source | New Hampshire Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Bridge |
Article published date | 2026-04-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Bridge tenders in United States of America
- FY2023 Patch Truck
- 20222023 Bridge Preventive Maintenance Program
- Small Bridge Design Services Various Locations throughout Ocean County
- Pipeline Trail Phase 1 Project
- Construction Engineering Inspection Services for FDOT LAP Bridge Projects
- Miccosukee Road Bridge Replacement
- Bridge Design Services 3 Bridges on CTH BB CTH N and CTH TT
- Emergency Repairs to HHW & Power Facilities Following the Ma...
