Pinson Dr., Cut-Off Rd., and Patterson Drive Water Main Replacement
One of 10,000+ tenders Taiyo tracks in Georgia.
The Project consists of the following major elements of work: replacement of an existing 2-inch water line with 4,099 ft. of 8-inch DIP water line. The existing water system will remain operational until installation and testing of the new waterline is complete and approved. Three wet-taps are required and one cut-in connection at the intersection of Patterson and Cut-off Roads which will effectiv
- Status
- Closed
- Sector
- Road, Power Transmission, Water Supply and Storage, Power Generation (CCGT)
- Location
- Georgia, United States of America
- Updated
- 3 Nov 2026
- Source
- Georgia Procurement Registry
ConstructChat
Ask ConstructChat about Pinson Dr., Cut-Off Rd., and Patterson Drive Water Main Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | under evaluation |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | The Project consists of the following major elements of work: replacement of an existing 2-inch water line with 4,099 ft. of 8-inch DIP water line. The existing water system will remain operational until installation and testing of the new waterline is complete and approved. Three wet-taps are required and one cut-in connection at the intersection of Patterson and Cut-off Roads which will effectively ¿loop¿ the distribution system with existing mains. Approximately, 1,950 lineal feet of trenching through improved hard surfaces is required including replacement of said surface. The remainder of the proposed waterline is outside of existing roadways. There are numerous instances of work near existing gas lines that require minimum horizontal separation, vertical clearance, and polywrapping of new water lines. Locations of said gas lines shall be verified by potholes by the Contractor. The project disturbs approximately 0.90 acres within the Nancy Creek Tributary requiring ES&PC best management practices. Please see attached advertisement for more information. |
Original sector | Construction / Public Works |
Location
Country | United States of America (USA) |
State | Georgia |
Source
Source | Georgia Procurement Registry |
URL |
More Details
Record type | Tender |
Sector | Road, Power Transmission, Water Supply and Storage, Power Generation (CCGT) |
Article published date | 2026-10-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Road tenders in United States
- Network Rail Commercial Property Maintenance Framework PSQ
- RFP - 2026-08-001
- SB011-27 822 Leonard Court Sinkhole Repair
- FREEDMAN GROVE ROAD ROADWAY IMPROVEMENTS
- RFP 26-20, On-Paving - Annual Contract
- SB013-26 Raised Intersections for Crogan Street at Perry Street and Clayton Street at Pike Street
- Road Work Bids- Resurface Macgruder Road
- Woodlawn Dr & Claxton Dairy Rd Roundabout
