Pitched Roofing Refurbishment - 63-69 Tollgate Road, Andover
Sector: Steel • Location: United Kingdom
Source: Find a Tender Service (UK)
Procurement for works for main hipped roof refurbishment to flat block owned and maintained by Aster Group and Private Leaseholders with the following address - 63 to 69 Tollgate Road, Andover, SP10 3RF. The project is comprised of the following responsibilities: Pre-Works Identify vents/fans needing disconnection. Check for live gas or solid fuel appliances before chimney removal; get Aster Surve
- Status
- Closed
- Sector
- Steel, Road, Commercial, Telecommunications
- Location
- United Kingdom
- Updated
- 3 Nov 2026
- Source
- Find a Tender Service (UK)
ConstructChat
Ask ConstructChat about Pitched Roofing Refurbishment - 63-69 Tollgate Road, Andover
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | complete |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | Procurement for works for main hipped roof refurbishment to flat block owned and maintained by Aster Group and Private Leaseholders with the following address - 63 to 69 Tollgate Road, Andover, SP10 3RF. The project is comprised of the following responsibilities: Pre-Works Identify vents/fans needing disconnection. Check for live gas or solid fuel appliances before chimney removal; get Aster Surveyor approval. Agree flue isolation, venting, and blocking up with residents and Aster Surveyor. Scaffolding Erect tubular steel scaffold with access for chimney removal. Measure to building face and include lift heights. TV & Satellite Relocate and reinstate 2 satellite dishes and 4 aerials. Test signals. Live aerials to be moved to loft post-removal. Chimney Removal Remove pots, flaunching, and chimney to below roof level. Cap and vent flues. Clear all waste. Structural Works Install new rafters, ridge timbers, and noggins to fill chimney void. Roof Strip & Insulation Remove tiles, battens, felt. Clear debris and install 50–75mm PIR insulation with ventilation gap. Roof Rebuild Fit breathable membrane, battens, and new tiles (Redland/Marley). Match colour to existing. Install dry ridge/hip tiles. Eaves & Guttering Fit eaves trays and rafter roll. Clean and retain existing gutters if serviceable; replace if not. Clean fascias/soffits if in good condition. Completion Test gutters for leaks and falls. Clean all windows, doors, fascias, and leave site tidy. |
Location
Country | United Kingdom (UK) |
Source
Source | Find a Tender Service (UK) |
URL |
More Details
Record type | Tender |
Sector | Steel, Road, Commercial, Telecommunications |
Article published date | 2026-09-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
