PKAA , Dream Canyon Project
The scope, dates and status of this tender. A free account opens every field.
Source: Rocky Mountain E-Purchasing System
The Dream Canyon Project work includes safeguarding features using a variety of closure methods . The project work will take place on privately owned properties . Scope of Work Historical Preservation Areas adjacent to the mine sites often contain related artifacts and structures , such as buildings , tipples , or
- Status
- Closed
- Sector
- Oil and Gas
- Location
- Rocky Mountain E-Purchasing System, United States of America
- Updated
- 3 Nov 2026
- Source
- Rocky Mountain E-Purchasing System
ConstructChat
Ask ConstructChat about PKAA , Dream Canyon Project
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | The Dream Canyon Project work includes safeguarding features using a variety of closure methods . The project work will take place on privately owned properties . Scope of Work Historical Preservation Areas adjacent to the mine sites often contain related artifacts and structures , such as buildings , tipples , ore houses , headframes and foundations that may be historically significant . Care shall be exercised to avoid any effect to these structures and artifacts , in order to preserve their integrity . Existing structures , except shaft timbering , shall not be used as loadbearing devices . Project Work Description The following descriptions delineate the Work , materials , and how measurements of completed Work will be made and paid for , for each bid item in the Bid Schedule . The Bidder is to read these definitions and price their bid accordingly . Item 1 . 0 Mobilization / Demobilization This item includes those measures necessary and incidental to move equipment and supplies onto the Project Area , to move equipment within the Project Area , and to complete any other requirements necessary to accomplish the goals of this Project . This item also includes all labor , equipment , and costs associated with demobilization and clean - up of the work site following completion of the Project . Please see Specification 1 . 0 , Mobilization / Demobilization of the General Bid Specifications , 2009 . Contractor must comply with the following provisions during performance of this Project : No clearing will be conducted without prior approval of the Project Manager and without an approved sediment control structure in place and functional , as required by Project Manager , until construction is completed . Generally , silt fence , installed per manufacturer ’ s specifications and Section 22 . 4 of the General Bid Specifications , 2009 is acceptable as a sediment control measure . Contractor will dispose of waste materials , including but not limited to refuse , garbage , sanitary wastes , spent solvents ; oil and other petroleum products off of the Project Area in accordance with applicable laws and regulations . Contractor will specify to Project Manager proposed methods for all waste collection and disposal , modes of waste transport , and waste disposal facilities and locations Contractor and subcontractors will use while performing the work , including making any necessary arrangements for waste collection and disposal . Any fees or charges required to be paid for collection , transport or disposal of waste materials shall be paid by Contractor . At its expense , Contractor will comply with all applicable federal , state , and local laws , ordinances , rules and regulations relating to the work , the site , and any materials and / or equipment provided by Contractor . Upon completion of the work under this Contract , the Contractor shall remove all temporary facilities , temporary infrastructure and equipment . The Contractor shall remove from the work site all rubbish , unused materials , and leave all areas in good order and condition , subject to the approval of the Project Manager . Noxious Weeds In an attempt to mitigate the rampant spread of noxious weeds from one area to another , there will be a mandatory inspection of all equipment to be used during the course of construction at the project site . Prior to inspection , it is the responsibility of the Contractor to employ whatever cleaning methods are necessary to ensure that all equipment is free of soil , seeds , vegetative matter , or other debris that could contain or hold seeds . Equipment shall be considered clean when a visual inspection determines the equipment free of such material . The Contractor will be required to notify the Project Manager in advance of mobilizing equipment on site to arrange for inspection . Disassembly of equipment components will not be required . Measurement and Payment Payment for Item 1 . 0 shall be reflected in a lump sum price under Item 1 . 0 on the Bid Schedule . Payment shall include all the Contractor ’ s expenses for mobilization of equipment to the site , transportation of the equipment within the project area , employee time , labor and materials necessary to accomplish the requirements of this item , compliance with the conditions and requirements described in this item description , and final clean - up of the workplace . |
Location
Country | United States of America (USA) |
State | Rocky Mountain E-Purchasing System |
Source
Source | Rocky Mountain E-Purchasing System |
URL |
More Details
Record type | Tender |
Sector | Oil and Gas |
Article published date | 2026-05-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Oil and Gas tenders in United States of America
- Road Material and Hauling Services
- Used Gasoline Collection Transport Recycling Service
- Town Wide Energy Resilience Master Plan
- ANTIFREEZE OILS AND LUBRICANTS
- Road Material and Hauling Services UPDATED
- Southeast Water Pollution Control Plant Biosolids Digester F...
- Sunol Long Term Improvements Alameda Creek Watershed Center
- City Distribution Division Fueling Station - BID TABULATION
